Difference between revisions of "Balticconnector"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 3: | Line 3: | ||
* Source: | * Source: | ||
* Destination: | * Destination: | ||
− | * Ownership: | + | * Ownership: Gasgrid Finland & Elering |
* Website: | * Website: | ||
− | * Length: | + | ** https://gasgrid.fi/ |
+ | ** https://elering.ee/ | ||
+ | * Length: 153 kilometres ( miles) | ||
* Capacity: The total transmission capacity of Balticconnector is 7.2 million cubic meters per day | * Capacity: The total transmission capacity of Balticconnector is 7.2 million cubic meters per day | ||
* Status: Operating | * Status: Operating |
Revision as of 16:40, 20 June 2022
Summary Information
- Source:
- Destination:
- Ownership: Gasgrid Finland & Elering
- Website:
- Length: 153 kilometres ( miles)
- Capacity: The total transmission capacity of Balticconnector is 7.2 million cubic meters per day
- Status: Operating
Details
- Balticconnector sea section from Paldiskist to Inkoon in Finland is 77 km. Mainland part in Estonia is 55 and in Finland 21 km.
History
- 2019 - The pipeline was commissioned
Other Information
- -