Difference between revisions of "Balticconnector"

From A Barrel Full
Jump to navigation Jump to search
Line 19: Line 19:
  
 
=== Links ===
 
=== Links ===
# []
+
# [https://abarrelfull.blogspot.com/2022/06/finnish-estonian-cooperation-secured.html Finnish-Estonian Cooperation Secured Successful Commissioning of Balticconnector]

Revision as of 16:38, 20 June 2022

Summary Information

  • Source:
  • Destination:
  • Ownership:
  • Website:
  • Length: kilometres ( miles)
  • Capacity: The total transmission capacity of Balticconnector is 7.2 million cubic meters per day
  • Status: Operating

Details

  • Balticconnector sea section from Paldiskist to Inkoon in Finland is 77 km. Mainland part in Estonia is 55 and in Finland 21 km.

History

  • -

Other Information

  • -

Links

  1. Finnish-Estonian Cooperation Secured Successful Commissioning of Balticconnector