Difference between revisions of "Baldpate Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Hess * Country: USA * Location: Garden Banks Blocks 215, 216, 259 & 260, Gulf of Mexico * Production start: 1998 * Partners: Anadarko * Type:...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Hess | * Operator: Hess | ||
* Country: USA | * Country: USA | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The development utilises a Compliant Tower located in 1,605 feet of water | * The development utilises a Compliant Tower located in 1,605 feet of water | ||
− | * Gas is transported on the | + | * Gas is transported on the [[Garden Banks Gas Pipeline]] |
− | * Oil is delivered to the SM 205 platform of the | + | * Oil is delivered to the SM 205 platform of the [[Poseidon Oil Pipeline]] |
− | + | === Contractors === | |
* **Gulf Marine Fab:** Construction of Compliant Tower | * **Gulf Marine Fab:** Construction of Compliant Tower | ||
* **UniversalPegasus:** Engineering services including conceptual and detailed design for the installation of a single flowline, control system, installation of high-pressure boarding valve skid, and new structural support system to receive riser | * **UniversalPegasus:** Engineering services including conceptual and detailed design for the installation of a single flowline, control system, installation of high-pressure boarding valve skid, and new structural support system to receive riser | ||
Line 20: | Line 20: | ||
* **Heerema Marine Contractors:** Baldpate Compliant Tower Installation | * **Heerema Marine Contractors:** Baldpate Compliant Tower Installation | ||
− | + | === History === | |
* 1991 - Baldpate Oil And Gas Field discovered | * 1991 - Baldpate Oil And Gas Field discovered | ||
* 1998 - First oil produced | * 1998 - First oil produced | ||
+ | * 2023 - Chevron agreed to acquire Hess, becoming a partner | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
− | # | + | # [[Gulf Of Mexico Deepwater Natural Gas And Oil Qualified Fields]] |
− | # | + | # [[Universalpegasus Subsea References]] |
− | # | + | # [[Fiberbond Offshore Platform References]] |
# [http://killajoules.wikidot.com/archive:cdi-baldpate-riser-installation-gulf-of-mexico-first CDI Baldpate Riser Installation Gulf Of Mexico First] | # [http://killajoules.wikidot.com/archive:cdi-baldpate-riser-installation-gulf-of-mexico-first CDI Baldpate Riser Installation Gulf Of Mexico First] | ||
+ | # [https://a-barrel-full.blogspot.com/2023/10/chevron-announces-agreement-to-acquire.html Chevron announces agreement to acquire Hess] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:USA]] | ||
+ | [[category:Hess]] |
Revision as of 15:26, 23 October 2023
Summary Information
- Operator: Hess
- Country: USA
- Location: Garden Banks Blocks 215, 216, 259 & 260, Gulf of Mexico
- Production start: 1998
- Partners: Anadarko
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The development utilises a Compliant Tower located in 1,605 feet of water
- Gas is transported on the Garden Banks Gas Pipeline
- Oil is delivered to the SM 205 platform of the Poseidon Oil Pipeline
Contractors
- **Gulf Marine Fab:** Construction of Compliant Tower
- **UniversalPegasus:** Engineering services including conceptual and detailed design for the installation of a single flowline, control system, installation of high-pressure boarding valve skid, and new structural support system to receive riser
- **Cal Dive International:** Installation of a 16-inch oil riser and 12-inch gas riser
- **Heerema Marine Contractors:** Baldpate Compliant Tower Installation
History
- 1991 - Baldpate Oil And Gas Field discovered
- 1998 - First oil produced
- 2023 - Chevron agreed to acquire Hess, becoming a partner