Difference between revisions of "Bakken Crude Express Pipeline Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * **Cancelled** * Source: North Dakota * Destination: Cushing, Oklahoma * Ownership: ONEOK Partners * Website: http://www.oneokpartners.com/ * Length: k...") |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
+++ Brief Description | +++ Brief Description | ||
− | * A 1,300-mile crude-oil pipeline with the capacity to transport 200,000 barrels per day (bpd). The Bakken Crude Express Pipeline will transport light-sweet crude oil from the | + | * A 1,300-mile crude-oil pipeline with the capacity to transport 200,000 barrels per day (bpd). The Bakken Crude Express Pipeline will transport light-sweet crude oil from the [[Bakken Oil Field | Bakken Shale]] in the Williston Basin in North Dakota to the Cushing, Okla., crude-oil market hub. |
+++ Pipeline Status | +++ Pipeline Status |
Revision as of 13:18, 25 March 2024
Summary Information
- **Cancelled**
- Source: North Dakota
- Destination: Cushing, Oklahoma
- Ownership: ONEOK Partners
- Website: http://www.oneokpartners.com/
- Length: kilometres (1,300 miles)
- Capacity: barrels of oil per day
- Crude Type: [[[Bakken Crude Oil]]]
+++ Brief Description
- A 1,300-mile crude-oil pipeline with the capacity to transport 200,000 barrels per day (bpd). The Bakken Crude Express Pipeline will transport light-sweet crude oil from the Bakken Shale in the Williston Basin in North Dakota to the Cushing, Okla., crude-oil market hub.
+++ Pipeline Status
- Pipeline was to be completed in 2015, but has been cancelled
+++ History
- 2012 - Project announced
- 2012 - ONEOK Partners Announces Open Season
- 2012 - ONEOK Partners Announces cancellation of the project
+++ Other Information
- The proposed pipeline route will be well-positioned to transport crude-oil production from the [[[Niobrara Shale Oil Field | Niobrara Shale]]]
+++ Links