Difference between revisions of "Bahrain Floating LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
* The project will comprise a Floating Storage Unit (FSU), an offshore LNG receiving jetty and breakwater, an adjacent regasification platform, subsea gas pipelines from the platform to shore, an onshore gas receiving facility, and an onshore nitrogen production facility. | * The project will comprise a Floating Storage Unit (FSU), an offshore LNG receiving jetty and breakwater, an adjacent regasification platform, subsea gas pipelines from the platform to shore, an onshore gas receiving facility, and an onshore nitrogen production facility. | ||
− | The project will have an initial capacity of 400 million standard cubic feet per day (expandable to 800 million standard cubic feet per day) | + | * The project will have an initial capacity of 400 million standard cubic feet per day (expandable to 800 million standard cubic feet per day) |
+ | |||
=== Technical Details === | === Technical Details === | ||
* Storage capacity: | * Storage capacity: |
Revision as of 10:01, 1 February 2020
Contents
Summary Information
- Ownership: Oil and Gas Holding Company and a consortium consisting of Teekay LNG Operating L.L.C., Gulf Investment Corporation and Samsung C&T Corporation
- Website: http://bahrainlng.com/
- Location: Khalifa Bin Salman Port
- Capacity: million tons/annum
- Status: In operation
Brief Description
- The project will comprise a Floating Storage Unit (FSU), an offshore LNG receiving jetty and breakwater, an adjacent regasification platform, subsea gas pipelines from the platform to shore, an onshore gas receiving facility, and an onshore nitrogen production facility.
- The project will have an initial capacity of 400 million standard cubic feet per day (expandable to 800 million standard cubic feet per day)
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- GS Engineering & Construction: EPC contractor
- Teekay LNG: Supply of the FSU vessel
Ongoing Projects/Project Status
- The terminal was commissioned in 2020
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2015 - Contracts awarded
- 2017 - Bahrain LNG Gives Final Notice to Proceed
- 2020 - Terminal completed
Other Information
-