Bach Ho Oil and Gas Field
Revision as of 17:15, 13 December 2021 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: Petrovietnam * Country: Vietnam * Location: * Production start: * Partners: * Type: Oil & Gas * Estimated Reserves: * Production Vo...")
Summary Information
- Operator: Petrovietnam
- Country: Vietnam
- Location:
- Production start:
- Partners:
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
Description
- The Bach Ho Oil And Gas Field is also known as the [[[White Tiger Oil and Gas Field]]]
- The field utilises FSO-5, a non-automatic oil tanker (no engine), 258.14m long, 46.4 wide, 24m high, 24m water-line, 150,000 ton dead tonnage, 173,796 m3 total containing capacity.
Contractors
- **Samsung:** Design, fabricate,test operate and install an offshoregas compression platform
- **PTSC:** Manufacture of FSO-5
- **London Marine:** Turret Mooring System
- **Kavin Engineering:** BK-14 / BT-7 Wellhead Satellite Platform project, Operation & Maintenance Manual Preparation
- **Jotun:** Painting
History
- 1998 - Samsung completed construction of the gas platform
- 2009 - Ship Launching of FSO 5 “PTSC – White Tiger”