Difference between revisions of "Bøyla Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Det Norske * Country: Norway * Location: 200 kilometres west of Haugesund * Production start: 2015 * Partners: Det Norske (65 per cent), Conoc...") |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
− | * Operator: | + | * Operator: AkerBP |
* Country: Norway | * Country: Norway | ||
* Location: 200 kilometres west of Haugesund | * Location: 200 kilometres west of Haugesund | ||
* Production start: 2015 | * Production start: 2015 | ||
− | * Partners: | + | * Partners: AkerBP (65 per cent), ConocoPhillips (20 per cent) and Lundin (15 per cent) |
* Type: Oil & Gas | * Type: Oil & Gas | ||
* Estimated Reserves: 23 million barrels of oil equivalent | * Estimated Reserves: 23 million barrels of oil equivalent | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Bøyla field is located in block 24/9 in the northern part of the North Sea | * The Bøyla field is located in block 24/9 in the northern part of the North Sea | ||
* The water depth at the site is approx. 120 metres. | * The water depth at the site is approx. 120 metres. | ||
* The development solution is a subsea installation consisting of two horizontal production wells and one water injection well. | * The development solution is a subsea installation consisting of two horizontal production wells and one water injection well. | ||
− | * These are tied in to the [[Alvheim Oil | + | * These are tied in to the [[Alvheim Oil and Gas Field | Alvheim FPSO]] (floating production, storage and offloading) for further transport and processing. |
− | + | === Contractors === | |
* **Technip:** | * **Technip:** | ||
** fabrication and reeled installation of a pipe-in-pipe production flowline, a plastic lined water injection flowline and a gas lift flowline, | ** fabrication and reeled installation of a pipe-in-pipe production flowline, a plastic lined water injection flowline and a gas lift flowline, | ||
Line 24: | Line 24: | ||
* **KWsubsea:** Predictive UHB analysis for pipe-in-pipe (21km), water injection (32km), gas line (25km) | * **KWsubsea:** Predictive UHB analysis for pipe-in-pipe (21km), water injection (32km), gas line (25km) | ||
− | + | === History === | |
* 2004 - Licence for the block awarded | * 2004 - Licence for the block awarded | ||
* 2009 - Bøyla oil field discovered | * 2009 - Bøyla oil field discovered | ||
Line 31: | Line 31: | ||
* 2014 - Marathon Oil Announces Sale of Norway Business to Det Norske | * 2014 - Marathon Oil Announces Sale of Norway Business to Det Norske | ||
* 2015 - First oil produced | * 2015 - First oil produced | ||
+ | * 2016 - BP and Det Norske merged their Norwegian assets | ||
− | + | === Geology === | |
− | * | + | * Bøyla produces oil from sandstone of late Paleocene to early Eocene age in the Hermod Formation. The reservoir has good quality and lies in a channelised submarine fan system at depth of 2,100 metres. |
− | + | === Links === | |
# [http://factpages.npd.no/factpages/default.aspx?culture=en&nav1=discovery&nav2=PageView|All&nav3=17237206 Norwegian Petroleum Directorate, Bøyla] | # [http://factpages.npd.no/factpages/default.aspx?culture=en&nav1=discovery&nav2=PageView|All&nav3=17237206 Norwegian Petroleum Directorate, Bøyla] | ||
# [http://www.marathonoil.com/Global_Operations/Norway/Operations/ Marathon Oil, Norway] | # [http://www.marathonoil.com/Global_Operations/Norway/Operations/ Marathon Oil, Norway] | ||
− | # | + | # [[KWsubsea Upheaval Buckling And Out Of Straightness Analysis]] |
# [http://killajoules.wikidot.com/archive:lundin-petroleum-discovers-oil-in-pl340-offshore-nor Lundin Petroleum Discovers Oil In PL340 Offshore Norway] | # [http://killajoules.wikidot.com/archive:lundin-petroleum-discovers-oil-in-pl340-offshore-nor Lundin Petroleum Discovers Oil In PL340 Offshore Norway] | ||
# [http://killajoules.wikidot.com/archive:npd-processes-development-plan-for-boyla-24-9-9-s NPD processes development plan for Bøyla – 24/9-9 S] | # [http://killajoules.wikidot.com/archive:npd-processes-development-plan-for-boyla-24-9-9-s NPD processes development plan for Bøyla – 24/9-9 S] | ||
Line 46: | Line 47: | ||
# [http://killajoules.wikidot.com/blog:5216 Marathon Oil Announces $2.7 Billion Sale of Norway Business] | # [http://killajoules.wikidot.com/blog:5216 Marathon Oil Announces $2.7 Billion Sale of Norway Business] | ||
# [http://killajoules.wikidot.com/blog:5717 Start-up of production from the Bøyla field] | # [http://killajoules.wikidot.com/blog:5717 Start-up of production from the Bøyla field] | ||
+ | # [https://abarrelfull.blogspot.com/2023/08/det-norske-and-bp-join-forces-to-grow.html Det norske and BP join forces to grow Norway’s leading independent oil and gas producer] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Norway]] | ||
+ | [[category:AkerBP]] |
Latest revision as of 09:01, 8 August 2023
Summary Information
- Operator: AkerBP
- Country: Norway
- Location: 200 kilometres west of Haugesund
- Production start: 2015
- Partners: AkerBP (65 per cent), ConocoPhillips (20 per cent) and Lundin (15 per cent)
- Type: Oil & Gas
- Estimated Reserves: 23 million barrels of oil equivalent
- Production Volume:
Description
- The Bøyla field is located in block 24/9 in the northern part of the North Sea
- The water depth at the site is approx. 120 metres.
- The development solution is a subsea installation consisting of two horizontal production wells and one water injection well.
- These are tied in to the Alvheim FPSO (floating production, storage and offloading) for further transport and processing.
Contractors
- **Technip:**
- fabrication and reeled installation of a pipe-in-pipe production flowline, a plastic lined water injection flowline and a gas lift flowline,
- fabrication and installation of rigid spools,
- manufacturing and installation of flexible jumpers and umbilicals,
- tie-in by divers, trenching, rockdumping, and ready for operation activities.
- **Reef Subsea:** Trenching services
- **KWsubsea:** Predictive UHB analysis for pipe-in-pipe (21km), water injection (32km), gas line (25km)
History
- 2004 - Licence for the block awarded
- 2009 - Bøyla oil field discovered
- 2012 - The Norwegian Petroleum Directorate received the plan for development and operation
- 2012 - Technip was awarded an engineering, procurement, installation and commissioning contract
- 2014 - Marathon Oil Announces Sale of Norway Business to Det Norske
- 2015 - First oil produced
- 2016 - BP and Det Norske merged their Norwegian assets
Geology
- Bøyla produces oil from sandstone of late Paleocene to early Eocene age in the Hermod Formation. The reservoir has good quality and lies in a channelised submarine fan system at depth of 2,100 metres.
Links
- Norwegian Petroleum Directorate, Bøyla
- Marathon Oil, Norway
- KWsubsea Upheaval Buckling And Out Of Straightness Analysis
- Lundin Petroleum Discovers Oil In PL340 Offshore Norway
- NPD processes development plan for Bøyla – 24/9-9 S
- Technip awarded a major contract for the Bøyla field development in Norway
- Reef Subsea secures contract award on Bøyla Development Project for Q1000 jet trencher
- Marathon Oil Announces $2.7 Billion Sale of Norway Business
- Start-up of production from the Bøyla field
- Det norske and BP join forces to grow Norway’s leading independent oil and gas producer