Audrey Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Centrica
  • Country: UK
  • Location: Southern North Sea
  • Production start: 1998
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field consists of two unmanned platforms, Audrey A & B
  • Audrey acts as the main gas processing and export hub for **Ann**, **Audrey**, **Alison** and **Annabel**
  • Gas exported via the [[[Lincolnshire Offshore Gas Gathering System (Loggs)]]].

+++ Contractors

  • **Heerema Marine Contractors:** Audrey platforms
  • **AMEC:** Topsides detailed engineering, procurement and platform modifications to facilitate the Annabel subsea completion

++++ Ann Gas Field Development

  • **J P Kenny:** Jack-up installed drilling template, manifold and protection structure


+++ History

  • 1987 - Field development approved
  • 1992 - Approval granted for Ann
  • 1995 - Alison approval granted
  • 1998 - Centrica acquires a stake from Powergen

+++ Geology

+++ Links

  1. UK Oil and Gas Fields by Approval Date
  2. List Of Oil and Gas Production Platforms In The UK
  3. FoundOcean Subsea References
  4. J P Kenny Subsea References
  5. Centrica strikes offshore deal
  6. AMEC Wins North Sea Engineering Services Contract from Venture Production