Difference between revisions of "Atapu Oil and Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
* Atapu is a pre-salt oil field in the Santos Basin, located in water depths of about 2,000 meters. | * Atapu is a pre-salt oil field in the Santos Basin, located in water depths of about 2,000 meters. | ||
* Production started in 2020 and has reached a plateau of 160,000 barrels per day with the first Floating, Production, Storage and Offloading unit [[P-70 FPSO]] | * Production started in 2020 and has reached a plateau of 160,000 barrels per day with the first Floating, Production, Storage and Offloading unit [[P-70 FPSO]] | ||
− | * A second FPSO is planned | + | * A second FPSO ([[P-84 FPSO]]) is planned, which would increase the overall oil production of the field to around 350,000 b/d. |
=== Contractors === | === Contractors === | ||
− | * | + | * '''Seatrium:''' EPC for FPSO |
=== History === | === History === | ||
Line 27: | Line 27: | ||
=== Links === | === Links === | ||
# [https://abarrelfull.blogspot.com/2024/05/brazil-totalenergies-expands-its-pre.html Brazil: TotalEnergies expands its pre-salt footprint on giant low-cost and low emissions reserves] | # [https://abarrelfull.blogspot.com/2024/05/brazil-totalenergies-expands-its-pre.html Brazil: TotalEnergies expands its pre-salt footprint on giant low-cost and low emissions reserves] | ||
− | # https://abarrelfull.blogspot.com/2024/05/shell-signs-production-sharing-contract.html Shell Signs Production Sharing Contract for Atapu Field in Brazil] | + | # [https://abarrelfull.blogspot.com/2024/05/shell-signs-production-sharing-contract.html Shell Signs Production Sharing Contract for Atapu Field in Brazil] |
+ | # [https://abarrelfull.blogspot.com/2024/05/petrobras-starts-production-in-atapu.html Petrobras starts production in Atapu pre-salt] | ||
+ | # [https://abarrelfull.blogspot.com/2024/05/petrobras-on-p-84-and-p-85-contracting.html Petrobras on P-84 and P-85 contracting process] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:Brazil]] | [[category:Brazil]] | ||
[[category:Petrobras]] | [[category:Petrobras]] |
Latest revision as of 06:28, 28 May 2024
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Santos Basin
- Production start: 2020
- Partners: Petrobras (52.5%), Shell (25%), TotalEnergies, (22.5%)
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume: 160,000 barrels per day
Description
- Atapu is a pre-salt oil field in the Santos Basin, located in water depths of about 2,000 meters.
- Production started in 2020 and has reached a plateau of 160,000 barrels per day with the first Floating, Production, Storage and Offloading unit P-70 FPSO
- A second FPSO (P-84 FPSO) is planned, which would increase the overall oil production of the field to around 350,000 b/d.
Contractors
- Seatrium: EPC for FPSO
History
- 2020 - First oil produced
- 2021 - Shell and Total became partners