Difference between revisions of "Ashtart Oil Field"

From A Barrel Full
Jump to navigation Jump to search
(Created page with " Summary Information * Operator: Serept * Country: Tunisia * Location: Gulf of Gabès * Production start: 1974 * Partners: * Type: Oil * Estimated Reserves: * Production Vo...")
 
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
 
* Operator: Serept
 
* Operator: Serept
 
* Country: Tunisia  
 
* Country: Tunisia  
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The field production facilities consist of 5 platforms
 
* The field production facilities consist of 5 platforms
 
** ASPF2 : 8 legs drilling platform: wellheads, power generation, water injection and gas compression facilities.
 
** ASPF2 : 8 legs drilling platform: wellheads, power generation, water injection and gas compression facilities.
Line 18: Line 18:
 
* Oil production is water-driven. The field is circled by water injection wells, using seawater
 
* Oil production is water-driven. The field is circled by water injection wells, using seawater
  
+++ Contractors
+
=== Contractors ===
 
* **Saipem:**  
 
* **Saipem:**  
 
** Gas Lift Project and General Revamping - new platform, Engineering Services
 
** Gas Lift Project and General Revamping - new platform, Engineering Services
Line 25: Line 25:
 
** Ashtart revamping project: Construction engineering, procurement, fabrication, dismantling, load-out and offshore revamping works.
 
** Ashtart revamping project: Construction engineering, procurement, fabrication, dismantling, load-out and offshore revamping works.
  
+++ History
+
=== History ===
 
* 1971 - Ashtart field was discovered
 
* 1971 - Ashtart field was discovered
 
* 1974 - Ashtart field entered operation
 
* 1974 - Ashtart field entered operation
Line 31: Line 31:
 
* 1997 - Arco acquired 50% share in the field from ENI
 
* 1997 - Arco acquired 50% share in the field from ENI
  
+++ Geology
+
=== Geology ===
 
* The Ashtart field consists of a single reservoir about 70 meters in thickness. The reservoir is heavily faulted; hence the production wells are practically non-interacting. The hydrocarbons are under-saturated, with downhole pressures in the range of 200 bars (eastern part of the reservoir) to 250 bars (western part of the reservoir), and temperatures of 140ºC. Most of the wells are at a substantial depth of ~3000 meters, and the Tubing Head Pressures (THP) are consequently low at ranging from 8 -10 bars.
 
* The Ashtart field consists of a single reservoir about 70 meters in thickness. The reservoir is heavily faulted; hence the production wells are practically non-interacting. The hydrocarbons are under-saturated, with downhole pressures in the range of 200 bars (eastern part of the reservoir) to 250 bars (western part of the reservoir), and temperatures of 140ºC. Most of the wells are at a substantial depth of ~3000 meters, and the Tubing Head Pressures (THP) are consequently low at ranging from 8 -10 bars.
  
+++ Links
+
=== Links ===
 
# [http://www.serept.com.tn/en/serept.php?sr=12 Ashtart, Serept]
 
# [http://www.serept.com.tn/en/serept.php?sr=12 Ashtart, Serept]
 
# [http://www.serept.com.tn/En/platforms_11_90 Ashtart, Platforms]
 
# [http://www.serept.com.tn/En/platforms_11_90 Ashtart, Platforms]

Latest revision as of 11:08, 2 December 2023

Summary Information

  • Operator: Serept
  • Country: Tunisia
  • Location: Gulf of Gabès
  • Production start: 1974
  • Partners:
  • Type: Oil
  • Estimated Reserves:
  • Production Volume:

Description

  • The field production facilities consist of 5 platforms
    • ASPF2 : 8 legs drilling platform: wellheads, power generation, water injection and gas compression facilities.
    • ASPF1: 8 legs drilling platform wellheads, process and gas compression facilities.
    • ASPF1: 4 legs production platform: water treatment, crude and condensate
    • ASPF1 : 4 legs platform: living quarters and a water injection treatment.
    • ASPF3: 6 legs drilling platform: wellheads, Living Quarter, Production and water injection wells, Oil and gas process facilities.
  • Oil production is water-driven. The field is circled by water injection wells, using seawater

Contractors

  • **Saipem:**
    • Gas Lift Project and General Revamping - new platform, Engineering Services
    • ASPF3 Platform - Fabrication and T&I
  • **Rosetti Marino:**
    • Ashtart revamping project: Construction engineering, procurement, fabrication, dismantling, load-out and offshore revamping works.

History

  • 1971 - Ashtart field was discovered
  • 1974 - Ashtart field entered operation
  • 1976 - Water injection was introduced
  • 1997 - Arco acquired 50% share in the field from ENI

Geology

  • The Ashtart field consists of a single reservoir about 70 meters in thickness. The reservoir is heavily faulted; hence the production wells are practically non-interacting. The hydrocarbons are under-saturated, with downhole pressures in the range of 200 bars (eastern part of the reservoir) to 250 bars (western part of the reservoir), and temperatures of 140ºC. Most of the wells are at a substantial depth of ~3000 meters, and the Tubing Head Pressures (THP) are consequently low at ranging from 8 -10 bars.

Links

  1. Ashtart, Serept
  2. Ashtart, Platforms
  3. Oil And Gas Concessions In Tunisia
  4. Saipem Gas And Oil Production And Treating Facilities References
  5. Saipem Fixed Offshore Production Facilities Engineering Refe
  6. Rosetti Marino Platform References
  7. ARCO to Purchase Elf Aquitaine's Assets in Tunisia, Including 50% Interest in Ashtart Oilfield