(Created page with "=== Summary Information === * Ownership: Sonatrach * Website: http://www.sonatrach-dz.com/ * Location: Arzew, Algeria * Capacity: 16.1 million tons/annum * Status: In opera...")
 
Line 4: Line 4:
 
* Website: http://www.sonatrach-dz.com/
 
* Website: http://www.sonatrach-dz.com/
 
* Location: Arzew, Algeria  
 
* Location: Arzew, Algeria  
* Capacity: 16.1 million tons/annum  
+
* Capacity: 20.8 million tons/annum  
 
* Status: In operation
 
* Status: In operation
  
 +
=== Brief Description ===
 +
* A large onshore liquefaction terminal with three trains
  
 
+
=== Technical Details ===
+++ Technical Details
 
 
* Storage capacity: 2 LNG x 160,000 cu.m each
 
* Storage capacity: 2 LNG x 160,000 cu.m each
 
* Constructor: Saipem / Chiyoda
 
* Constructor: Saipem / Chiyoda
Line 15: Line 16:
  
  
+++ Ongoing Projects/Project Status
+
=== Ongoing Projects/Project Status ===
 
* The terminal was expanded by the addition of a third train, which was completed in [[LNG Terminal Projects Completed in 2014 | 2014]]
 
* The terminal was expanded by the addition of a third train, which was completed in [[LNG Terminal Projects Completed in 2014 | 2014]]
 
* The third train is also known as the Gassi Touil LNG Terminal
 
* The third train is also known as the Gassi Touil LNG Terminal
  
  
+++ Suppliers / Customers
+
=== Suppliers / Customers ===
* Suppliers: Gas is to be supplied by the [[[Gassi Touil Gas Field]]] and [[[Rhourde Nouss Gas Field]]]
+
* Suppliers: Gas is supplied by the [[Gassi Touil Gas Field]] and [[Rhourde Nouss Gas Field]]
 
* Customers:  
 
* Customers:  
  
+++ History
+
=== History ===
 
* 1965 - First cargo loaded
 
* 1965 - First cargo loaded
 
* 2006 - Repsol & Sonatrach sign agreement to develop train 3
 
* 2006 - Repsol & Sonatrach sign agreement to develop train 3
Line 31: Line 32:
 
* 2014 - First gas from train 3
 
* 2014 - First gas from train 3
  
+++ Other Information
+
=== Other Information ===
 
* -
 
* -
  

Revision as of 10:42, 27 June 2022

Summary Information

Brief Description

  • A large onshore liquefaction terminal with three trains

Technical Details

  • Storage capacity: 2 LNG x 160,000 cu.m each
  • Constructor: Saipem / Chiyoda
  • Licensor:


Ongoing Projects/Project Status

  • The terminal was expanded by the addition of a third train, which was completed in 2014
  • The third train is also known as the Gassi Touil LNG Terminal


Suppliers / Customers

History

  • 1965 - First cargo loaded
  • 2006 - Repsol & Sonatrach sign agreement to develop train 3
  • 2007 - Sonatrach takes over the project
  • 2008 - Sonatrach awarded Saipem/Snamprogetti, in a joint venture with Chiyoda, the lump sum turn key contract encompassing the EPC (engineering, procurement and construction)
  • 2014 - First gas from train 3

Other Information

  • -

Links

  1. Saipem LNG References
  2. Saipem wins 2.8 billion euro contract in Algeria entering the LNG sector
  3. Algeria sees two LNG units onstream in 2012, 2013
  4. GDF SUEZ: 50th anniversary of the first LNG commercial chain between Algeria and France