Summary Information
- Ownership: Sonatrach
- Website: http://www.sonatrach-dz.com/
- Location: Arzew, Algeria
- Capacity: 20.8 million tons/annum
- Status: In operation
Brief Description
- A large onshore liquefaction terminal with three trains
Technical Details
- Storage capacity: 2 LNG x 160,000 cu.m each
- Constructor:
- Saipem / Chiyoda
- JGC - FEED
- Licensor:
Ongoing Projects/Project Status
- The terminal was expanded by the addition of a third train, which was completed in 2014
- The third train is also known as the Gassi Touil LNG Terminal
Suppliers / Customers
- Suppliers: Gas is supplied by the Gassi Touil Gas Field and Rhourde Nouss Gas Field
- Customers:
History
- 1965 - First cargo loaded
- 2006 - Repsol & Sonatrach sign agreement to develop train 3
- 2007 - Sonatrach takes over the project
- 2008 - Sonatrach awarded Saipem/Snamprogetti, in a joint venture with Chiyoda, the lump sum turn key contract encompassing the EPC (engineering, procurement and construction)
- 2014 - First gas from train 3
Other Information
- -