Difference between revisions of "Armada Sterling II FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 15: | Line 15: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * Keppel Shipyard: |
+ | ** refurbishment and life extension works, upgrading of living quarters to accommodate 70 personnel, | ||
+ | ** fabrication and installation of an internal turret mooring system | ||
+ | ** installation and integration of topside process modules | ||
=== Status === | === Status === | ||
− | * | + | * In operation |
=== History === | === History === | ||
* 2013 - Bumi Armada and Shapoorji Pallonji awarded FPSO contract | * 2013 - Bumi Armada and Shapoorji Pallonji awarded FPSO contract | ||
+ | * 2014 - Sail away ceremony | ||
+ | * 2015 - Vessel began production | ||
=== Other Information === | === Other Information === | ||
Line 29: | Line 34: | ||
=== Links === | === Links === | ||
− | # [ ] | + | # [http://killajoules.wikidot.com/blog:3851 Bumi Armada And Shapoorji Pallonji Company Limited Joint Venture Secures Second FPSO From ONGC] |
[[Category:FSPO]] | [[Category:FSPO]] | ||
[[Category:Country]] | [[Category:Country]] | ||
[[Category:Company]] | [[Category:Company]] |
Revision as of 13:57, 7 February 2024
Contents
Summary Information
- Name: Armada Sterling II FPSO
- Field: Cluster 7 Oil and Gas Fields
- Country: India
- Ownership: Bumi Armada and Shapoorji Pallonji
- Website:
- Field Operated By: ONGC
- Capacity: bpd
- Year of Completion: 2015
Brief Description
- -
Contractors
- Keppel Shipyard:
- refurbishment and life extension works, upgrading of living quarters to accommodate 70 personnel,
- fabrication and installation of an internal turret mooring system
- installation and integration of topside process modules
Status
- In operation
History
- 2013 - Bumi Armada and Shapoorji Pallonji awarded FPSO contract
- 2014 - Sail away ceremony
- 2015 - Vessel began production
Other Information
- -