* Name: Armada Perdana FPSO | * Name: Armada Perdana FPSO | ||
− | * Field: | + | * Field: [[Oyo Oil Field]] |
* Country: Nigeria | * Country: Nigeria | ||
* Ownership: Bumi Armada | * Ownership: Bumi Armada | ||
Line 10: | Line 10: | ||
* Year of Completion: 2009 | * Year of Completion: 2009 | ||
− | + | === Brief Description === | |
* The Armada Perdana FPSO has a treatment capacity of 40,000 barrels of liquids per day, with gas treatment and re-injection facilities, and is capable of storing up to 1 million barrels of crude oil. | * The Armada Perdana FPSO has a treatment capacity of 40,000 barrels of liquids per day, with gas treatment and re-injection facilities, and is capable of storing up to 1 million barrels of crude oil. | ||
− | + | === Contractors === | |
* **Keppel:** Fabrication, installation and integration of a 12-point spread mooring system, riser balcony, topside facilities and upgrade of accommodation and auxiliary support systems | * **Keppel:** Fabrication, installation and integration of a 12-point spread mooring system, riser balcony, topside facilities and upgrade of accommodation and auxiliary support systems | ||
* **DPS Global:** ESD / DCS System, Power Generation, Heating/Cooling Medium, Water Injection, Gas Dehydration, Gas Compression, Flare Knock Out, Production Separation / PWT, Detailed Design, FEED | * **DPS Global:** ESD / DCS System, Power Generation, Heating/Cooling Medium, Water Injection, Gas Dehydration, Gas Compression, Flare Knock Out, Production Separation / PWT, Detailed Design, FEED | ||
Line 22: | Line 22: | ||
** E-House Design | ** E-House Design | ||
− | + | === Status === | |
* In operation | * In operation | ||
− | + | === History === | |
* 2008 - Bumi Armada awarded FPSO supply contract | * 2008 - Bumi Armada awarded FPSO supply contract | ||
* 2009 - Conversion completed | * 2009 - Conversion completed | ||
* 2014 - Camac signs five year lease contract | * 2014 - Camac signs five year lease contract | ||
+ | * 2019 - Bumi Armada Sells Armada Perdana FPSO to Century Energy Services | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [[DPS FPSO References]] | # [[DPS FPSO References]] | ||
Line 42: | Line 43: | ||
# [http://killajoules.wikidot.com/archive:bumi-armadas-second-fpso-named-armada-perdana Bumi Armada’s second FPSO named ‘Armada Perdana] | # [http://killajoules.wikidot.com/archive:bumi-armadas-second-fpso-named-armada-perdana Bumi Armada’s second FPSO named ‘Armada Perdana] | ||
# [http://killajoules.wikidot.com/blog:4883 CAMAC Energy Secures Long-Term FPSO] | # [http://killajoules.wikidot.com/blog:4883 CAMAC Energy Secures Long-Term FPSO] | ||
+ | # [https://abarrelfull.blogspot.com/2023/02/bumi-armada-sells-armada-perdana-fpso.html Bumi Armada Sells Armada Perdana FPSO] | ||
[[Category:FSPO]] | [[Category:FSPO]] | ||
[[Category:Nigeria]] | [[Category:Nigeria]] | ||
[[Category:Bumi Armada]] | [[Category:Bumi Armada]] |
Latest revision as of 14:50, 4 February 2023
Contents
Summary Information
- Name: Armada Perdana FPSO
- Field: Oyo Oil Field
- Country: Nigeria
- Ownership: Bumi Armada
- Website:
- Field Operated By: CAMAC
- Capacity: 40,000 bpd
- Year of Completion: 2009
Brief Description
- The Armada Perdana FPSO has a treatment capacity of 40,000 barrels of liquids per day, with gas treatment and re-injection facilities, and is capable of storing up to 1 million barrels of crude oil.
Contractors
- **Keppel:** Fabrication, installation and integration of a 12-point spread mooring system, riser balcony, topside facilities and upgrade of accommodation and auxiliary support systems
- **DPS Global:** ESD / DCS System, Power Generation, Heating/Cooling Medium, Water Injection, Gas Dehydration, Gas Compression, Flare Knock Out, Production Separation / PWT, Detailed Design, FEED
- **Technics:** Four units of natural gas booster compression systems on an EPCC basis (i.e., design and process engineering, procurement, construction and commissioning
- **Kavin Engineering:**
- Design and Engineering of Compressor Module – Reciprocating Compressors
- E-House Design
Status
- In operation
History
- 2008 - Bumi Armada awarded FPSO supply contract
- 2009 - Conversion completed
- 2014 - Camac signs five year lease contract
- 2019 - Bumi Armada Sells Armada Perdana FPSO to Century Energy Services
Other Information
- -
Links
- DPS FPSO References
- Kavin Engineering FPSO References
- Technics Oil & Gas Wins Single-Largest Deal Worth S$30 Million
- Keppel Shipyard on track to another successful conversion for repeat customer
- Bumi Armada’s second FPSO named ‘Armada Perdana
- CAMAC Energy Secures Long-Term FPSO
- Bumi Armada Sells Armada Perdana FPSO