* A large onshore liquefaction terminal that will be built in three trains
+
 
 +
* The project will involve the installation of three gravity-based structures in the Gulf of Ob on which will be installed the three liquefaction trains of 6.6 Mt/year capacity each
 
* Arctic LNG 2 production will be delivered to international markets by a fleet of ice-class LNG carriers that will be able to use the Northern Sea Route and the transshipment terminal in Kamchatka for cargoes destined for Asia and the transshipment terminal close to Murmansk for cargoes destined for Europe.
 
* Arctic LNG 2 production will be delivered to international markets by a fleet of ice-class LNG carriers that will be able to use the Northern Sea Route and the transshipment terminal in Kamchatka for cargoes destined for Asia and the transshipment terminal close to Murmansk for cargoes destined for Europe.
 
* In addition to LNG the project will have gas condensate production capacity of 1.6 million tons per annum
 
* In addition to LNG the project will have gas condensate production capacity of 1.6 million tons per annum
Line 29: Line 30:
 
=== History ===
 
=== History ===
 
* 2018 - Front-end engineering design (FEED) was completed
 
* 2018 - Front-end engineering design (FEED) was completed
 +
* 2018 - Total acquires 10% of the project
 
* 2019 - Final investment decision
 
* 2019 - Final investment decision
 
* 2021 - Sales agreements signed with ENN and Zhejiang Energy
 
* 2021 - Sales agreements signed with ENN and Zhejiang Energy

Latest revision as of 11:56, 19 January 2022

Summary Information

  • Ownership: Novatek, Total, CNPC, CNOOC
  • Website: https://www.novatek.ru/
  • Location: Gydan peninsula, Russia
  • Capacity: 19.8 million tons/annum
  • Status: Under Construction

Brief Description

  • The project will involve the installation of three gravity-based structures in the Gulf of Ob on which will be installed the three liquefaction trains of 6.6 Mt/year capacity each
  • Arctic LNG 2 production will be delivered to international markets by a fleet of ice-class LNG carriers that will be able to use the Northern Sea Route and the transshipment terminal in Kamchatka for cargoes destined for Asia and the transshipment terminal close to Murmansk for cargoes destined for Europe.
  • In addition to LNG the project will have gas condensate production capacity of 1.6 million tons per annum

Technical Details

  • Storage capacity:
  • Constructor:
    • TechnipFMC: Engineering, Procurement and Construction (EPC)
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning of the first train is expected in 2023

Suppliers / Customers

  • Suppliers: Gas is to be supplied from the Utrenneye Gas and Condensate Field
  • Customers:
    • Zhejiang Energy; 1 mn tons per annum for 15 years
    • ENN: 0.6 mn tons per annum for 11 years

History

  • 2018 - Front-end engineering design (FEED) was completed
  • 2018 - Total acquires 10% of the project
  • 2019 - Final investment decision
  • 2021 - Sales agreements signed with ENN and Zhejiang Energy

Other Information

  • -

Links

  1. Total expands partnership with Novatek through Arctic LNG 2 project
  2. Russia: Launch of the Giant Arctic LNG 2 Development
  3. TechnipFMC Awarded a Major Contract for the Arctic LNG 2 Project in West Siberia
  4. NOVATEK and Zhejiang Energy Sign Sales and Purchase Agreement on Long-Term LNG Supply
  5. NOVATEK and ENN Natural Gas Sign Sales and Purchase Agreement on Long-Term LNG Supply