Difference between revisions of "Arabiyah and Hasbah Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Saudi Aramco * Country: Saudi-Arabia * Location: Eastern Province * Production start: * Partners: * Type: Gas * Estimated Reserves: * Produc...") |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
+++ Contractors | +++ Contractors | ||
* Saipem: The complete development of the two fields | * Saipem: The complete development of the two fields | ||
− | + | ** Engineering, procurement, fabrication and installation of a total of 12 wellhead platforms, 2 tie-in platforms and 1 injection platform, besides to a 36 inches 260-kilometres-long export trunkline and approximately 200 kilometres of mono-ethylene glycol (MEG) pipelines, 200 kilometres of subsea electric and control cables and 40 kilometres of offshore flowlines. | |
* The scope of work also includes the shore approaches and about 120 kilometres of onshore pipelines. | * The scope of work also includes the shore approaches and about 120 kilometres of onshore pipelines. | ||
Line 26: | Line 26: | ||
+++ Links | +++ Links | ||
− | # | + | # [[Saipem Fixed Offshore Production Facilities Project References]] |
− | # | + | # [[Saipem Pipeline References]] |
# [http://killajoules.wikidot.com/blog:621 Saipem wins new E&C Offshore contracts worth in excess of $2.2 billion] | # [http://killajoules.wikidot.com/blog:621 Saipem wins new E&C Offshore contracts worth in excess of $2.2 billion] |
Revision as of 22:00, 17 January 2023
Summary Information
- Operator: Saudi Aramco
- Country: Saudi-Arabia
- Location: Eastern Province
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The development includes 12 wellhead platforms, 2 tie-in platforms and 1 injection platform
- Gas is transported to shore by a 36 inches 260-kilometres-long export trunkline
- The gas is to be processed in the [[[Wasit Gas Processing Plant]]]
+++ Contractors
- Saipem: The complete development of the two fields
- Engineering, procurement, fabrication and installation of a total of 12 wellhead platforms, 2 tie-in platforms and 1 injection platform, besides to a 36 inches 260-kilometres-long export trunkline and approximately 200 kilometres of mono-ethylene glycol (MEG) pipelines, 200 kilometres of subsea electric and control cables and 40 kilometres of offshore flowlines.
* The scope of work also includes the shore approaches and about 120 kilometres of onshore pipelines.
+++ History
- 2011 - Saipem awarded EPCI contract
+++ Geology
+++ Links