Annamaria Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: ENI
- Country: Italy
- Location: Adriatic
- Production start: 2010
- Partners:
- Type: Gas
- Estimated Reserves: 10 billion cubic metres
- Production Volume:
+++ Description
- The “Annamaria‘ field extends between Italy and Croatia, 60 kilometres from the coast and at a depth of about 60 metres. It is the first cross-border field to be put into production in the Adriatic
- It has twin platforms, “Annamaria A" on the Croatian side and “Annamaria B" on the Italian side
- The gas is transported via an underwater pipeline to the Fano treatment plant, roughly 70 kilometres away, to be fed into the national distribution network.
- Annamaria B is connected to 6 producing wells
+++ Contractors
- The platforms were built by a consortium consisting of Rosetti Marino, Saipem Energy Services and Intermare Sarda in the Italian yards; Marina di Ravenna and Arbatax, and the Rijeka yard in Croatia
- **Viktor Lenac:** Annamaria A - Gas production platform
- **Saipem:**
* Annamaria A/B Basic Design and Detail Design * Transport & Installation of Annamaria A & B platform, topside and sealines
+++ History
- 2002 - ENI signed an agreement for the development of the field
- 2009 - Platform installed
- 2010 - First gas produced
+++ Geology
+++ Links
- Offshore Platforms in Italy
- Tecon Platform References
- Viktor Lenac Platform References
- Rosetti Marino Platform References
- Saipem Fixed Offshore Production Facilities Engineering Refe
- Saipem Europe Fixed Offshore Production Facilities Project R
- Eni: Start Up Of The Gas Fields In The Offshore of Croatia With Reserves Of 20 Billion Cubic Meters
- Eni starts production on the Italian section of the Annamaria field, off the Marche coast