Difference between revisions of "Amoca, Miztón and Tecoalli Oil Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: ENI | * Operator: ENI | ||
* Country: Mexico | * Country: Mexico | ||
* Location: Campeche Bay | * Location: Campeche Bay | ||
− | * Production start: | + | * Production start: 2019 |
* Partners: | * Partners: | ||
* Type: Oil | * Type: Oil | ||
Line 9: | Line 9: | ||
* Target Production Volume: 90,000 bopd | * Target Production Volume: 90,000 bopd | ||
− | + | === Description === | |
* The development will be phased, initially with an early production phase with startup planned in 1H 2019, through a Well Head Platform located on the Miztón field. | * The development will be phased, initially with an early production phase with startup planned in 1H 2019, through a Well Head Platform located on the Miztón field. | ||
* Production will be sent onshore through a 10” multiphase line and then treated at an existing Pemex facility. Early production plateau will be 8,000 barrels of oil per day (bopd) | * Production will be sent onshore through a 10” multiphase line and then treated at an existing Pemex facility. Early production plateau will be 8,000 barrels of oil per day (bopd) | ||
− | * Full field production | + | * Full field production utilises the [[Miamte MV34 FPSO]] which is capable of handling 90,000 barrels of oil per day, 75 million cubic feet of gas per day and 120,000 barrels of water injection per day with a storage capacity of 700,000 barrels of oil. |
* Two additional platforms will be installed on the Amoca field and one on the Tecoalli field. | * Two additional platforms will be installed on the Amoca field and one on the Tecoalli field. | ||
* Area 1 production plateau will be 90,000 bopd from 2021. | * Area 1 production plateau will be 90,000 bopd from 2021. | ||
* Total development capex are estimated at 1.9 billion dollars. | * Total development capex are estimated at 1.9 billion dollars. | ||
− | + | === Contractors === | |
* **Modec:** Supply of FPSO | * **Modec:** Supply of FPSO | ||
− | + | === History === | |
* 2017 - Amoca field discovered | * 2017 - Amoca field discovered | ||
* 2018 - Development plan approved | * 2018 - Development plan approved | ||
+ | * 2019 - First oil produced from early production system | ||
+ | * 2022 - Full production began with FPSO | ||
− | + | === Geology === | |
* The oil is in Pliocene reservoir sandstones | * The oil is in Pliocene reservoir sandstones | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/archive:modec-awarded-letter-of-intent-by-eni-mexico-related MODEC Awarded Letter of Intent by Eni Mexico related to FPSO - Chartering, Operation and Maintenance - for Area 1 Project in Mexico] | # [http://killajoules.wikidot.com/archive:modec-awarded-letter-of-intent-by-eni-mexico-related MODEC Awarded Letter of Intent by Eni Mexico related to FPSO - Chartering, Operation and Maintenance - for Area 1 Project in Mexico] | ||
# [http://killajoules.wikidot.com/archive:eni-drills-successful-well-offshore-mexico Eni drills successful well offshore Mexico] | # [http://killajoules.wikidot.com/archive:eni-drills-successful-well-offshore-mexico Eni drills successful well offshore Mexico] |
Latest revision as of 18:07, 11 November 2023
Summary Information
- Operator: ENI
- Country: Mexico
- Location: Campeche Bay
- Production start: 2019
- Partners:
- Type: Oil
- Estimated Reserves: 2.1 billion of oil equivalent in place
- Target Production Volume: 90,000 bopd
Description
- The development will be phased, initially with an early production phase with startup planned in 1H 2019, through a Well Head Platform located on the Miztón field.
- Production will be sent onshore through a 10” multiphase line and then treated at an existing Pemex facility. Early production plateau will be 8,000 barrels of oil per day (bopd)
- Full field production utilises the Miamte MV34 FPSO which is capable of handling 90,000 barrels of oil per day, 75 million cubic feet of gas per day and 120,000 barrels of water injection per day with a storage capacity of 700,000 barrels of oil.
- Two additional platforms will be installed on the Amoca field and one on the Tecoalli field.
- Area 1 production plateau will be 90,000 bopd from 2021.
- Total development capex are estimated at 1.9 billion dollars.
Contractors
- **Modec:** Supply of FPSO
History
- 2017 - Amoca field discovered
- 2018 - Development plan approved
- 2019 - First oil produced from early production system
- 2022 - Full production began with FPSO
Geology
- The oil is in Pliocene reservoir sandstones