Summary Information
+
=== Summary Information ===
 
* Operator: ENI  
 
* Operator: ENI  
 
* Country: Mexico
 
* Country: Mexico
Line 9: Line 9:
 
* Target Production Volume: 90,000 bopd
 
* Target Production Volume: 90,000 bopd
  
+++ Description
+
=== Description ===
 
* The development will be phased, initially with an early production phase with startup planned in 1H 2019, through a Well Head Platform located on the Miztón field.  
 
* The development will be phased, initially with an early production phase with startup planned in 1H 2019, through a Well Head Platform located on the Miztón field.  
 
* Production will be sent onshore through a 10” multiphase line and then treated at an existing Pemex facility. Early production plateau will be 8,000 barrels of oil per day (bopd)
 
* Production will be sent onshore through a 10” multiphase line and then treated at an existing Pemex facility. Early production plateau will be 8,000 barrels of oil per day (bopd)
* Full field production will utilise a Floating Production, Storage and Offloading facility (FPSO). The FPSO will be capable of processing 90,000 barrels of crude oil per day, 75 million cubic feet of gas per day, 120,000 barrels of water injection per day and have a storage capacity of 900,000 barrels of crude oil.
+
* Full field production utilises the [[Miamte MV34 FPSO]] which is capable of handling 90,000 barrels of oil per day, 75 million cubic feet of gas per day and 120,000 barrels of water injection per day with a storage capacity of 700,000 barrels of oil.
 
* Two additional platforms will be installed on the Amoca field and one on the Tecoalli field.  
 
* Two additional platforms will be installed on the Amoca field and one on the Tecoalli field.  
 
* Area 1 production plateau will be 90,000 bopd from 2021.  
 
* Area 1 production plateau will be 90,000 bopd from 2021.  
 
* Total development capex are estimated at 1.9 billion dollars.  
 
* Total development capex are estimated at 1.9 billion dollars.  
  
+++ Contractors
+
=== Contractors ===
 
* **Modec:** Supply of FPSO
 
* **Modec:** Supply of FPSO
  
+++ History
+
=== History ===
 
* 2017 - Amoca field discovered
 
* 2017 - Amoca field discovered
 
* 2018 - Development plan approved
 
* 2018 - Development plan approved
  
+++ Geology
+
=== Geology ===
 
* The oil is in Pliocene reservoir sandstones
 
* The oil is in Pliocene reservoir sandstones
  
+++ Links
+
=== Links ===
 
# [http://killajoules.wikidot.com/archive:modec-awarded-letter-of-intent-by-eni-mexico-related MODEC Awarded Letter of Intent by Eni Mexico related to FPSO - Chartering, Operation and Maintenance - for Area 1 Project in Mexico]
 
# [http://killajoules.wikidot.com/archive:modec-awarded-letter-of-intent-by-eni-mexico-related MODEC Awarded Letter of Intent by Eni Mexico related to FPSO - Chartering, Operation and Maintenance - for Area 1 Project in Mexico]
 
# [http://killajoules.wikidot.com/archive:eni-drills-successful-well-offshore-mexico Eni drills successful well offshore Mexico]
 
# [http://killajoules.wikidot.com/archive:eni-drills-successful-well-offshore-mexico Eni drills successful well offshore Mexico]

Revision as of 06:51, 17 April 2023

Summary Information

  • Operator: ENI
  • Country: Mexico
  • Location: Campeche Bay
  • Production start: Expected 2019
  • Partners:
  • Type: Oil
  • Estimated Reserves: 2.1 billion of oil equivalent in place
  • Target Production Volume: 90,000 bopd

Description

  • The development will be phased, initially with an early production phase with startup planned in 1H 2019, through a Well Head Platform located on the Miztón field.
  • Production will be sent onshore through a 10” multiphase line and then treated at an existing Pemex facility. Early production plateau will be 8,000 barrels of oil per day (bopd)
  • Full field production utilises the Miamte MV34 FPSO which is capable of handling 90,000 barrels of oil per day, 75 million cubic feet of gas per day and 120,000 barrels of water injection per day with a storage capacity of 700,000 barrels of oil.
  • Two additional platforms will be installed on the Amoca field and one on the Tecoalli field.
  • Area 1 production plateau will be 90,000 bopd from 2021.
  • Total development capex are estimated at 1.9 billion dollars.

Contractors

  • **Modec:** Supply of FPSO

History

  • 2017 - Amoca field discovered
  • 2018 - Development plan approved

Geology

  • The oil is in Pliocene reservoir sandstones

Links

  1. MODEC Awarded Letter of Intent by Eni Mexico related to FPSO - Chartering, Operation and Maintenance - for Area 1 Project in Mexico
  2. Eni drills successful well offshore Mexico
  3. Eni announces the approval of the Development Plan for Area 1 discoveries offshore Mexico