Difference between revisions of "Algiers El Harrach Refinery Project"

From A Barrel Full
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
** After: 3.6 million tons/annum & 72,000 bbl/day
 
** After: 3.6 million tons/annum & 72,000 bbl/day
 
* Nelson Complexity:
 
* Nelson Complexity:
* Project Stage: Completed 2020
+
* Project Stage: Completed 2019
 
* Budget: USD 908 million
 
* Budget: USD 908 million
=== The Project
+
 
 +
=== The Project ===
 
* Project Type: Upgrade and debottlenecking
 
* Project Type: Upgrade and debottlenecking
 
* Project Summary: A refurbishment and revamping of the existing units plus the addition of gasoline specification units
 
* Project Summary: A refurbishment and revamping of the existing units plus the addition of gasoline specification units
 
* Main Contractors
 
* Main Contractors
 
** Technip: Lump sum turnkey contract for the complete scope of works, including the design, supply of equipment and bulk material, construction and start-up
 
** Technip: Lump sum turnkey contract for the complete scope of works, including the design, supply of equipment and bulk material, construction and start-up
 +
 
=== Refining Units ===
 
=== Refining Units ===
 
* Topping and gas plant capacity increase.
 
* Topping and gas plant capacity increase.
Line 33: Line 35:
 
* 2010 - Technip awarded LSTK contract for project
 
* 2010 - Technip awarded LSTK contract for project
 
* 2013 - Emerson awarded valve supply contract
 
* 2013 - Emerson awarded valve supply contract
 +
* 2016 - CPECC awarded the project
 
* 2020 - Project completed
 
* 2020 - Project completed
=== Other Information
+
=== Other Information ===
-
+
* The contract with Technip was cancelled and they were replaced by CPECC
 +
 
 
=== Links ===
 
=== Links ===
 
# [http://killajoules.wikidot.com/blog:223 Technip awarded major contract in Algeria]
 
# [http://killajoules.wikidot.com/blog:223 Technip awarded major contract in Algeria]

Latest revision as of 16:28, 16 March 2020

Summary Information

  • Ownership: Sonatrach
  • Website: http://www.sonatrach-dz.com/ (French)
  • Wiki Page: El Harrach Refinery
  • Location: Algiers, Algeria
  • Capacity:
    • Before: 2.7 million tons/annum & 54,000 bbl/day
    • After: 3.6 million tons/annum & 72,000 bbl/day
  • Nelson Complexity:
  • Project Stage: Completed 2019
  • Budget: USD 908 million

The Project

  • Project Type: Upgrade and debottlenecking
  • Project Summary: A refurbishment and revamping of the existing units plus the addition of gasoline specification units
  • Main Contractors
    • Technip: Lump sum turnkey contract for the complete scope of works, including the design, supply of equipment and bulk material, construction and start-up

Refining Units

  • Topping and gas plant capacity increase.
  • New MS Block (NHT + Isom + CCR Reforming)
  • RFCC and Merox Units
  • Rehabilitation of Utility production and distribution facilities
  • Moderniztion of the Instrumentation (implementation of DCS with a centralized control room)
  • Rehabilitation of electrical equipment, upgrading of electrical network, and setting up of a gas turbine,
  • New Waste Water Treatment Unit (biological type)

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

  • Gasoline meeting Euro standards

History

  • 2010 - Technip awarded LSTK contract for project
  • 2013 - Emerson awarded valve supply contract
  • 2016 - CPECC awarded the project
  • 2020 - Project completed

Other Information

  • The contract with Technip was cancelled and they were replaced by CPECC

Links

  1. Technip awarded major contract in Algeria
  2. Technip selects Emerson as main control valve supplier for Algiers Refinery upgrade project
  3. Oil Refineries upgrading Program For the production of clean fuels In Algeria
  4. Algiers refinery: commissioning of production units (APS)