Alen Gas and Condensate Field
Jump to navigation
Jump to search
Summary Information
- Operator: Noble
- Country: Equatorial Guinea
- Location: Block “O” off the East coast of Bioko Island
- Production start: 2013
- Partners:
- Type: Gas And Condensate
- Estimated Reserves:
- Production Volume:
+++ Description
- Initial development of the Alen Field includes three production wells and three subsea natural gas injection wells tied to a processing platform.
- Produced condensate is separated and piped to the Aseng floating production, storage, and offloading vessel (FPSO) on Block I, approximately 15 miles to the south
- Gas produced is reinjected back into the reservoir to maintain pressure and maximize liquid recoveries.
+++ Contractors
- **McDermott:** Construction of central Production Platform deck, jacket, piling, flare boom and bridge and Wellhead Platform deck module, jacket, and piling
- **Stress Subsea:** Subsea System Front End Engineering Design (FEED) covering Subsea Hardware, Umbilicals, Flowlines and Export Pipelines
- **Nessco:** Communications systems
+++ History
- 2010 - FEED contract awarded
- 2011 - Development approval granted
- 2013 - First condensate produced
+++ Geology
+++ Links