=== Description === | === Description === | ||
− | * The field is to be developed as a subsea tieback to the | + | * The field is to be developed as a subsea tieback to the [[Britannia Gas Field]] |
* The field development will consist of drilling of up to two production wells and the installation of subsea infrastructure, including a production manifold, a 27 kilometre (km) production flowline to transport reservoir fluids to the Britannia BLP and a control and chemical umbilical. | * The field development will consist of drilling of up to two production wells and the installation of subsea infrastructure, including a production manifold, a 27 kilometre (km) production flowline to transport reservoir fluids to the Britannia BLP and a control and chemical umbilical. | ||
* The Alder Field has a maximum estimated recovery of 4,820 million scm of gas over an estimated field life of 10 years. | * The Alder Field has a maximum estimated recovery of 4,820 million scm of gas over an estimated field life of 10 years. | ||
Line 23: | Line 23: | ||
=== History === | === History === | ||
* 2013 - Technip awarded subsea contract | * 2013 - Technip awarded subsea contract | ||
− | * 2014 - Final investment decision | + | * 2014 - Final investment decision and regulatory approval |
* 2016 - First gas produced | * 2016 - First gas produced | ||
* 2019 - Ithaca energy acquired Chevron's stake | * 2019 - Ithaca energy acquired Chevron's stake | ||
Line 31: | Line 31: | ||
=== Links === | === Links === | ||
+ | # [[UK Oil and Gas Fields by Approval Date]] | ||
# [[Serimax Pipeline References]] | # [[Serimax Pipeline References]] | ||
# [http://killajoules.wikidot.com/blog:4406 Technip awarded subsea contract by Chevron North Sea] | # [http://killajoules.wikidot.com/blog:4406 Technip awarded subsea contract by Chevron North Sea] |
Revision as of 15:45, 31 August 2023
Summary Information
- Operator: Ithaca
- Country: UK
- Location: North Sea
- Production start: 2016
- Partners: Chevron - 70%, Conocophillips - 25%, GDF-Suez - 5%
- Type: Gas And Condensate
- Estimated Reserves: 4,820 million scm of gas (recoverable)
- Production Volume:
Description
- The field is to be developed as a subsea tieback to the Britannia Gas Field
- The field development will consist of drilling of up to two production wells and the installation of subsea infrastructure, including a production manifold, a 27 kilometre (km) production flowline to transport reservoir fluids to the Britannia BLP and a control and chemical umbilical.
- The Alder Field has a maximum estimated recovery of 4,820 million scm of gas over an estimated field life of 10 years.
- The project has a planned design capacity of 110 million cubic feet of natural gas and 14,000 barrels of condensate per day
Contractors
- **Technip:** engineering, manufacturing and installation:
- the detailed design and pipelay of a 28-kilometer 16” pipe-in-pipe system,
- the installation of a 28-kilometer hybrid umbilical
- various subsea works including the installation of a manifold structure including HIPPS, subsea isolation valve structure, valves and spoolpiece components.
History
- 2013 - Technip awarded subsea contract
- 2014 - Final investment decision and regulatory approval
- 2016 - First gas produced
- 2019 - Ithaca energy acquired Chevron's stake