* Location: Campos Basin, offshore Brazil | * Location: Campos Basin, offshore Brazil | ||
* Production start: | * Production start: | ||
− | * Partners: | + | * Partners: Petrobras 100% |
− | * Type: Oil | + | * Type: Oil & Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
− | * Production Volume: | + | * Production Volume: 36,400 barrels of oil per day and 606,000 m3/day of gas (2020) |
=== Description === | === Description === |
Revision as of 09:36, 9 December 2021
Summary Information
- Operator: Petrobras
- Country: Brazil
- Location: Campos Basin, offshore Brazil
- Production start:
- Partners: Petrobras 100%
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume: 36,400 barrels of oil per day and 606,000 m3/day of gas (2020)
Description
- The Albacora field has an area of 455 km2 and is located in the northern area of the Campos Basin, in water depths ranging from 100 to 1,050 m, at a distance of about 110 km from Cabo de São Tomé, on the northern coast of the state of Rio de Janeiro. It was the first giant deepwater field in Brazil
- The Albacora field comprises 65 wells, two production units (semisubmersible P-25 and P-31 FPSO) and seven diverless manifolds (six for oil production and one for water injection).
- The production capacity is 150,000 bopd and 90 mmcf/d of natural gas.
- The semisubmersible platform P-25 has a process plant with the capacity of 100,000 bopd and 115 mmcf/d of natural gas.
- There are 14 production wells connected directly to the platform (satellite wells) and 16 wells connected to two diverless production manifolds by a vertical flowline connection system.
- These FMC Technologies manifolds, installed in December 1995 and April 1996, were the world’s deepest subsea production manifolds and multiplex control pods at the time.
- The FPSO P-31 process plant capacity is 200,000 bopd and 130 mmcf/d of gas.
- The plant processes the oil produced in P-25 platform and the oil production of 28 production wells connected to four FMC Technologies production diverless manifolds.
Contractors
- FMC Technologies:
- Design and construction of permanent internal mooring system for FPSO
- Subsea trees, production manifolds, control modules & vertical connection modules
History
- 1984 - The Albacora field was discovered
- 2007 - Temporary stoppage due to riser problems