Difference between revisions of "Albacora Leste P-50 FPSO"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Name: Albacora Leste P 50 FPSO * Field: Albacora Leste Oil And Gas Field * Country: Brazil * Ownership: Petrobras * Website: http://www.petrobras....")
 
 
Line 37: Line 37:
 
# [[Aker Solutions Increased Oil Recovery (IOR) References]]
 
# [[Aker Solutions Increased Oil Recovery (IOR) References]]
 
# [[Nessco FPSO References]]
 
# [[Nessco FPSO References]]
# [[Tecna Oil And Gas Processing References]]
+
# [[TECNA Oil And Gas Processing References]]
 
# [http://killajoules.wikidot.com/archive:sembcorp-marine-in-us-357-million-petrobras-p-50-fps SembCorp Marine in US$357 million Petrobras P-50 FPSO deal]
 
# [http://killajoules.wikidot.com/archive:sembcorp-marine-in-us-357-million-petrobras-p-50-fps SembCorp Marine in US$357 million Petrobras P-50 FPSO deal]
 
# [http://killajoules.wikidot.com/archive:repsol-ypf-is-partner-in-brazils-largest-oil-platfor Repsol YPF is Partner in Brazil’s Largest Oil Platform]
 
# [http://killajoules.wikidot.com/archive:repsol-ypf-is-partner-in-brazils-largest-oil-platfor Repsol YPF is Partner in Brazil’s Largest Oil Platform]

Latest revision as of 08:15, 31 January 2024

Summary Information

+++ Brief Description

  • The vessel has a production capacity of 180,000 barrels of oil per day and compression capacity of six million cubic metres of natural gas a day
  • The FPSO was made by the conversion of a 280,000-dwt very large crude tanker (VLCC) "Felipe Camarao"

+++ Contractors

  • **Jurong Shipyard:** FPSO conversion including marine hull conversion and engineering, fabrication, installation, integration and commissioning of the topside modules
  • **Aker Solutions:** Water Injection - Sulphate removal unit: SRU booster feed pumps, SRU fine filters, SRU membrane trains ,SRU cleaning package, SRU control panel, chemical injection, SW El-chlorination unit, SW coarse filter SW deaerator water injection pumps - EPC
  • **Tecna:** Gas & Water Re-injection
  • **Nessco:** Telecoms systems

+++ Status

  • In operation

+++ History

  • 2002 - Jurong Shipyard awarded conversion contract
  • 2006 - Production is launched on the field

+++ Other Information

  • -

+++ Links

  1. Aker Solutions Oil And Gas Processing References
  2. Aker Solutions Increased Oil Recovery (IOR) References
  3. Nessco FPSO References
  4. TECNA Oil And Gas Processing References
  5. SembCorp Marine in US$357 million Petrobras P-50 FPSO deal
  6. Repsol YPF is Partner in Brazil’s Largest Oil Platform