Difference between revisions of "Al Zour LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Kuwait Petroleum Corporation * Website: https://www.kpc.com.kw/ * Location: Al Zour * Capacity: 11 million tons/annum * Status: Under Con...") |
Abarrelfull (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Ownership: Kuwait Petroleum Corporation | * Ownership: Kuwait Petroleum Corporation | ||
Line 5: | Line 5: | ||
* Location: Al Zour | * Location: Al Zour | ||
* Capacity: 11 million tons/annum | * Capacity: 11 million tons/annum | ||
− | * Status: | + | * Status: In operation |
− | + | === Brief Description === | |
* A large scale import terminal including a regasification system, eight LNG storage tanks with a capacity of 225,500 m³ each, two marine jetties, and berthing facilities for loading. | * A large scale import terminal including a regasification system, eight LNG storage tanks with a capacity of 225,500 m³ each, two marine jetties, and berthing facilities for loading. | ||
− | + | ||
+ | === Technical Details === | ||
* Storage capacity: 1.8 BCM | * Storage capacity: 1.8 BCM | ||
* Unloading capacity: | * Unloading capacity: | ||
Line 17: | Line 18: | ||
− | |||
− | |||
− | + | === Ongoing Projects/Project Status === | |
+ | * The project was commissioned in [[LNG Terminal Projects Completed in 2021 | 2021]] | ||
+ | |||
+ | === Suppliers / Customers === | ||
* Suppliers: | * Suppliers: | ||
* Customers: | * Customers: | ||
− | + | ||
+ | === History === | ||
* 2016 - EPC contract awarded | * 2016 - EPC contract awarded | ||
* 2018 - Korea Eximbank signs financing deal | * 2018 - Korea Eximbank signs financing deal | ||
+ | * 2021 - Terminal operation starts | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [http://www.example.com https://kipic.com.kw/SUMM_LNGI_R01_25032018.pdf Environmental Impact Assessment] | # [http://www.example.com https://kipic.com.kw/SUMM_LNGI_R01_25032018.pdf Environmental Impact Assessment] | ||
# [http://killajoules.wikidot.com/archive:hyundai-e-c-and-hyundai-engineering-win-the-al-zour Hyundai E&C and Hyundai Engineering win the Al-Zour LNG Import Terminal Project in Kuwait] | # [http://killajoules.wikidot.com/archive:hyundai-e-c-and-hyundai-engineering-win-the-al-zour Hyundai E&C and Hyundai Engineering win the Al-Zour LNG Import Terminal Project in Kuwait] | ||
# [http://killajoules.wikidot.com/archive:korea-eximbank-to-provide-usd-1-15-billion-for-lng-i Korea Eximbank to Provide USD 1.15 Billion for LNG Import Terminal Project in Kuwait] | # [http://killajoules.wikidot.com/archive:korea-eximbank-to-provide-usd-1-15-billion-for-lng-i Korea Eximbank to Provide USD 1.15 Billion for LNG Import Terminal Project in Kuwait] |
Latest revision as of 14:17, 6 January 2022
Contents
Summary Information
- Ownership: Kuwait Petroleum Corporation
- Website: https://www.kpc.com.kw/
- Location: Al Zour
- Capacity: 11 million tons/annum
- Status: In operation
Brief Description
- A large scale import terminal including a regasification system, eight LNG storage tanks with a capacity of 225,500 m³ each, two marine jetties, and berthing facilities for loading.
Technical Details
- Storage capacity: 1.8 BCM
- Unloading capacity:
- Send out capacity:
- Constructor: Hyundai E&C and Hyundai Engineering
Ongoing Projects/Project Status
- The project was commissioned in 2021
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2016 - EPC contract awarded
- 2018 - Korea Eximbank signs financing deal
- 2021 - Terminal operation starts
Other Information
- -