Difference between revisions of "Al Zour LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 21: | Line 21: | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | * | + | * The project was commissioned in [[LNG Terminal Projects Completed in 2021 | 2021]] |
− | |||
=== Suppliers / Customers === | === Suppliers / Customers === |
Revision as of 14:17, 6 January 2022
Contents
Summary Information
- Ownership: Kuwait Petroleum Corporation
- Website: https://www.kpc.com.kw/
- Location: Al Zour
- Capacity: 11 million tons/annum
- Status: Under Construction
Brief Description
- A large scale import terminal including a regasification system, eight LNG storage tanks with a capacity of 225,500 m³ each, two marine jetties, and berthing facilities for loading.
Technical Details
- Storage capacity: 1.8 BCM
- Unloading capacity:
- Send out capacity:
- Constructor: Hyundai E&C and Hyundai Engineering
Ongoing Projects/Project Status
- The project was commissioned in 2021
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2016 - EPC contract awarded
- 2018 - Korea Eximbank signs financing deal
- 2021 - Terminal operation starts