Difference between revisions of "Al Zour LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Ownership: Kuwait Petroleum Corporation * Website: https://www.kpc.com.kw/ * Location: Al Zour * Capacity: 11 million tons/annum * Status: Under Con...")
 
Line 1: Line 1:
Summary Information
+
=== Summary Information ===
  
 
* Ownership: Kuwait Petroleum Corporation
 
* Ownership: Kuwait Petroleum Corporation
Line 7: Line 7:
 
* Status:  Under Construction
 
* Status:  Under Construction
  
+++ Brief Description
+
 
 +
=== Brief Description ===
 
* A large scale import terminal including a regasification system, eight LNG storage tanks with a capacity of 225,500 m³ each, two marine jetties, and berthing facilities for loading.  
 
* A large scale import terminal including a regasification system, eight LNG storage tanks with a capacity of 225,500 m³ each, two marine jetties, and berthing facilities for loading.  
  
+++ Technical Details
+
 
 +
=== Technical Details ===
 
* Storage capacity: 1.8 BCM
 
* Storage capacity: 1.8 BCM
 
* Unloading capacity:
 
* Unloading capacity:
Line 17: Line 19:
  
  
+++ Ongoing Projects/Project Status
 
* Commissioning is expected in [[[LNG Terminal Projects Completed in 2021 | 2021]]]
 
  
+++ Suppliers / Customers
+
=== Ongoing Projects/Project Status ===
 +
* Commissioning is expected in [[LNG Terminal Projects Completed in 2021 | 2021]]
 +
 
 +
 
 +
=== Suppliers / Customers ===
 
* Suppliers:  
 
* Suppliers:  
 
* Customers:  
 
* Customers:  
  
  
+++ History
+
 
 +
=== History ===
 
* 2016 - EPC contract awarded
 
* 2016 - EPC contract awarded
 
* 2018 - Korea Eximbank signs financing deal
 
* 2018 - Korea Eximbank signs financing deal
  
+++ Other Information
+
 
 +
=== Other Information ===
 
* -
 
* -
  
+++ Relevant Links
+
=== Links ===
 
# [http://www.example.com https://kipic.com.kw/SUMM_LNGI_R01_25032018.pdf Environmental Impact Assessment]
 
# [http://www.example.com https://kipic.com.kw/SUMM_LNGI_R01_25032018.pdf Environmental Impact Assessment]
 
# [http://killajoules.wikidot.com/archive:hyundai-e-c-and-hyundai-engineering-win-the-al-zour Hyundai E&C and Hyundai Engineering win the Al-Zour LNG Import Terminal Project in Kuwait]
 
# [http://killajoules.wikidot.com/archive:hyundai-e-c-and-hyundai-engineering-win-the-al-zour Hyundai E&C and Hyundai Engineering win the Al-Zour LNG Import Terminal Project in Kuwait]
 
# [http://killajoules.wikidot.com/archive:korea-eximbank-to-provide-usd-1-15-billion-for-lng-i Korea Eximbank to Provide USD 1.15 Billion for LNG Import Terminal Project in Kuwait]
 
# [http://killajoules.wikidot.com/archive:korea-eximbank-to-provide-usd-1-15-billion-for-lng-i Korea Eximbank to Provide USD 1.15 Billion for LNG Import Terminal Project in Kuwait]

Revision as of 11:05, 16 December 2021

Summary Information

  • Ownership: Kuwait Petroleum Corporation
  • Website: https://www.kpc.com.kw/
  • Location: Al Zour
  • Capacity: 11 million tons/annum
  • Status: Under Construction


Brief Description

  • A large scale import terminal including a regasification system, eight LNG storage tanks with a capacity of 225,500 m³ each, two marine jetties, and berthing facilities for loading.


Technical Details

  • Storage capacity: 1.8 BCM
  • Unloading capacity:
  • Send out capacity:
  • Constructor: Hyundai E&C and Hyundai Engineering


Ongoing Projects/Project Status

  • Commissioning is expected in 2021


Suppliers / Customers

  • Suppliers:
  • Customers:


History

  • 2016 - EPC contract awarded
  • 2018 - Korea Eximbank signs financing deal


Other Information

  • -

Links

  1. https://kipic.com.kw/SUMM_LNGI_R01_25032018.pdf Environmental Impact Assessment
  2. Hyundai E&C and Hyundai Engineering win the Al-Zour LNG Import Terminal Project in Kuwait
  3. Korea Eximbank to Provide USD 1.15 Billion for LNG Import Terminal Project in Kuwait