Difference between revisions of "Al Zaafarana Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Gemsa Petroleum Company * Country: Egypt * Location: * Production start: * Partners: SOG 20%, SK 25%, Anadarko 25%, PICO Zaafarana 30% * Type...") |
Abarrelfull (talk | contribs) |
||
Line 11: | Line 11: | ||
+++ Description | +++ Description | ||
* Zaafarana has a 4-leg production platform that has 15 well slots. Zafco produces from 8 wells operated by ESP (electric submersible pumps) employing a unique Cable Deployed Pumping System (CDPS). The System has been operating successfully, eliminating the need for an offshore rig at the end of each pump life cycle. | * Zaafarana has a 4-leg production platform that has 15 well slots. Zafco produces from 8 wells operated by ESP (electric submersible pumps) employing a unique Cable Deployed Pumping System (CDPS). The System has been operating successfully, eliminating the need for an offshore rig at the end of each pump life cycle. | ||
− | * The produced crude is processed and stored on the | + | * The produced crude is processed and stored on the [[Al Zaafarana FPSO]] having a storage capacity of 800,000 bbls. |
+++ Contractors | +++ Contractors |
Latest revision as of 13:49, 13 November 2023
Summary Information
- Operator: Gemsa Petroleum Company
- Country: Egypt
- Location:
- Production start:
- Partners: SOG 20%, SK 25%, Anadarko 25%, PICO Zaafarana 30%
- Type: Oil / Gas
- Estimated Reserves: 44 mmbbl
- Production Volume: 7,500 bopd
+++ Description
- Zaafarana has a 4-leg production platform that has 15 well slots. Zafco produces from 8 wells operated by ESP (electric submersible pumps) employing a unique Cable Deployed Pumping System (CDPS). The System has been operating successfully, eliminating the need for an offshore rig at the end of each pump life cycle.
- The produced crude is processed and stored on the Al Zaafarana FPSO having a storage capacity of 800,000 bbls.
+++ Contractors
- **Aker Kvaerner:** Operation, management and maintenance of the Al Zaafarana FPSO
+++ History
- 1989 - BG Group declared Al Zaafarana Oil Field to be commercial
- 2007 - Aker Kvaerner wins contract for operation, management and maintenance of the Al Zaafarana FPSO
+++ Geology
+++ Links