Difference between revisions of "Al Shaheen Oil Field"

From A Barrel Full
Jump to navigation Jump to search
 
Line 4: Line 4:
 
* Location: Block 5, Offshore
 
* Location: Block 5, Offshore
 
* Production start: 1994
 
* Production start: 1994
* Partners:  
+
* Partners: QatarEnergy 70%, Total 30%
 
* Type: Oil: [[Al Shaheen Crude Oil]]
 
* Type: Oil: [[Al Shaheen Crude Oil]]
 
* Estimated Reserves:
 
* Estimated Reserves:
Line 47: Line 47:
 
* 2010 - The field produces its 1 Billionth barrel of oil
 
* 2010 - The field produces its 1 Billionth barrel of oil
 
* 2010 - Contract signed for FSO Africa
 
* 2010 - Contract signed for FSO Africa
 +
* 2017 - Total became a partner by acquiring Maersk
 
* 2024 - Contracts awarded for phase 3
 
* 2024 - Contracts awarded for phase 3
  
Line 67: Line 68:
 
# [http://killajoules.wikidot.com/archive:fso-africa-contract FSO Africa contract]
 
# [http://killajoules.wikidot.com/archive:fso-africa-contract FSO Africa contract]
 
# [http://cdm.unfccc.int/Projects/DB/DNV-CUK1162979371.3/view Al-Shaheen Oil Field Gas Recovery and Utilization Project]
 
# [http://cdm.unfccc.int/Projects/DB/DNV-CUK1162979371.3/view Al-Shaheen Oil Field Gas Recovery and Utilization Project]
 +
# [https://abarrelfull.blogspot.com/2022/09/total-acquires-maersk-oil-for-745.html Total acquires Maersk Oil for $7.45 billion in a share and debt transaction]
 
# [https://a-barrel-full.blogspot.com/2024/01/qatarenergy-announces-award-of-6.html Qatarenergy Announces The Award Of $6 Billion EPC Contracts To Increase Oil Production By About 100,000 Bpd From Al-Shaheen Oil Field]
 
# [https://a-barrel-full.blogspot.com/2024/01/qatarenergy-announces-award-of-6.html Qatarenergy Announces The Award Of $6 Billion EPC Contracts To Increase Oil Production By About 100,000 Bpd From Al-Shaheen Oil Field]
  
Line 72: Line 74:
 
[[category:Qatar]]
 
[[category:Qatar]]
 
[[category:QatarEnergy]]
 
[[category:QatarEnergy]]
 +
[[category:Total]]

Latest revision as of 07:49, 1 February 2024

Summary Information

  • Operator: Total
  • Country: Qatar
  • Location: Block 5, Offshore
  • Production start: 1994
  • Partners: QatarEnergy 70%, Total 30%
  • Type: Oil: Al Shaheen Crude Oil
  • Estimated Reserves:
  • Production Volume: 300,000 barrels a day

Description

  • A large offshore oil field. Associated gas is piped to Qatar Petroleum onshore gas complexes
  • The FSO Africa and FSO Asia are used to store the crude oil
  • Knock Nevis FSO was previously used prior to 2009
  • The phase three development project will add 100,000 bpd of capacity by 2027

Contractors

  • Euronav: Supply of FSO Africa & Asia
  • Dubai DDW: FSO conversions
  • Hyundai Heavy Industries:
  • Aker Solutions:
    • Installation of oil separation plant
    • Offloading systems for the FSO's
  • SLP Engineering: Package 12 (BF, CF, EF, GC Platforms and Bridges BC-BF, CC-CF, EC-EF)
  • Larsen & Toubro:
    • HB Flare Platform
    • Two new offshore platform top-sides, a flare platform and interconnecting bridge
  • Seaway Heavy Lifting:
    • Installation HB Flare Platform
    • Installation of Package 12 (BF, CF, EF, GC Platforms and Bridges BC-BF, CC-CF, EC-EF)

Phase 3 (Ruya)

  • McDermott and Qingdao: EPC package for 9 wellhead platforms
  • McDermott and Hyundai Heavy Industries: EPC package for a Central Processing Platform
  • Larsen & Toubro: EPC package for a riser platform
  • China Offshore Oil Engineering Co (COOEC): EPC package for subsea pipelines and cables

History

  • 1992 - Maersk Oil signed an Exploration & Production Sharing Agreement (EPSA) with Qatar Petroleum to develop the field
  • 1994 - Oil production from the field commenced initially from temporary offshore facilities
  • 1998 - these were supplemented by permanent production facilities at three locations
  • 2001 - New field development plan
  • 2004 - The facilities were expanded with three additional platform locations
  • 2005 - Qatar Petroleum and Maersk Oil Qatar Agree on Further Development
  • 2006 - Al-Shaheen Oil Field Gas Recovery and Utilization Project launched
  • 2010 - FSO Asia delivered
  • 2010 - The field produces its 1 Billionth barrel of oil
  • 2010 - Contract signed for FSO Africa
  • 2017 - Total became a partner by acquiring Maersk
  • 2024 - Contracts awarded for phase 3

Geology

Links

  1. Aker Solutions Oil And Gas Processing References
  2. Aker FPSO Pusnes Offloading Systems
  3. Jotun Platform References
  4. Seaway Heavy Lifting Oil And Gas References
  5. Hyundai Heavy Industries Platform References
  6. International Protective Coatings Floating Platform Referenc
  7. Bluewater Calm Buoy Mooring References
  8. Maersk Oil, Qatar
  9. Qatar Petroleum and Maersk Oil Qatar Agree on Further Development
  10. L&T wins order for largest export project
  11. Maersk Oil production in Qatar reaches billionth barrel
  12. Delivery FSO Asia
  13. FSO Africa contract
  14. Al-Shaheen Oil Field Gas Recovery and Utilization Project
  15. Total acquires Maersk Oil for $7.45 billion in a share and debt transaction
  16. Qatarenergy Announces The Award Of $6 Billion EPC Contracts To Increase Oil Production By About 100,000 Bpd From Al-Shaheen Oil Field