Difference between revisions of "Aker Platform Pusnes Offloading Systems"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "# Gaza FSO #* Bouri Oil And Gas Field #* Libya #* 2014 #* 100m 21" 360m 20"/16" Swiveling coupler + RHHW # Tanker Pacific Offshore Termi Uote FSO Brazil 2013 150m 21" Not...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
# Gaza FSO | # Gaza FSO | ||
− | #* [[Bouri Oil | + | #* [[Bouri Oil and Gas Field]] |
#* Libya | #* Libya | ||
#* 2014 | #* 2014 | ||
Line 15: | Line 15: | ||
#* 2006 | #* 2006 | ||
#* 80m - 13" / RHHW, Floating hose | #* 80m - 13" / RHHW, Floating hose | ||
− | # [[Njord Oil | + | # [[Njord Oil and Gas Field]] |
#* Njord B - Norway | #* Njord B - Norway | ||
#* Norsk Hydro | #* Norsk Hydro |
Latest revision as of 08:57, 21 February 2024
- Gaza FSO
- Bouri Oil and Gas Field
- Libya
- 2014
- 100m 21" 360m 20"/16" Swiveling coupler + RHHW
- Tanker Pacific Offshore Termi Uote FSO Brazil 2013 150m 21" Not supplied Reel + RHHW
- PRA-1 Pumping Platform
- Marlim Leste Oil Field - Brazil
- Modec / Petrobras
- 2006
- 140m - 21" / Reel + RHHW, Floating hose
- Moho Bilondo FPU - Nigeria
- Moho Bilondo Oil Field - Congo
- Total
- 2006
- 80m - 13" / RHHW, Floating hose
- Njord Oil and Gas Field
- Njord B - Norway
- Norsk Hydro
- 85m 21" 115m 20" Chute + HHW
- 1996
- Liverpool Bay OSI
- Douglas Oil Field - UK
- BHP
- 1999
- QC/DC, Floating hose