Ain Tsila Gas and Condensate Field
Revision as of 15:15, 15 July 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Petroceltic * Country: Algeria * Location: Isarene permit * Production start: Expected 2017 * Partners: Petroceltic - 56.625%, with Enel - 18....")
Summary Information
- Operator: Petroceltic
- Country: Algeria
- Location: Isarene permit
- Production start: Expected 2017
- Partners: Petroceltic - 56.625%, with Enel - 18.375% and Sonatrach 25%.
- Type: Gas & Condensate
- Estimated Reserves: 2.1 Trillion Cubic Feet of sales gas, 67 million barrels of condensate and 108 million barrels of Liquid Petroleum Gas
- Production Volume:
+++ Description
- The development includes a 420 million cubic feet per day gas plant and initially, 18 production wells
+++ Contractors
- **CB&I:** FEED development for a grassroots 420 million cubic feet per day gas plant facility, plus three associated pipelines and well collection
+++ History
- 2009 - Ain Tsila Gas And Condensate Field discovered
- 2012 - Final regulatory approval
- 2014 - CBI awarded gas plant contract
+++ Geology
+++ Links