Revision history of "Ain Tsila Gas and Condensate Field"

Jump to navigation Jump to search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 15:15, 15 July 2023Abarrelfull talk contribs 1,224 bytes +1,224 Created page with "Summary Information * Operator: Petroceltic * Country: Algeria * Location: Isarene permit * Production start: Expected 2017 * Partners: Petroceltic - 56.625%, with Enel - 18...."