Line 5: Line 5:
 
* Edison (10%).
 
* Edison (10%).
 
* Website: http://www.adriaticlng.com/
 
* Website: http://www.adriaticlng.com/
 +
** [[Exxon Mobil LNG Terminals]]
 
* Location: Porto Viro
 
* Location: Porto Viro
 
* Capacity: million tons/annum , 8 billion cubic meters of natural gas a year
 
* Capacity: million tons/annum , 8 billion cubic meters of natural gas a year
Line 24: Line 25:
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
 
* In operation since 2009
 
* In operation since 2009
=== Suppliers / Customers
+
 
 +
=== Suppliers / Customers ===
 
* Suppliers: Qatar Gas
 
* Suppliers: Qatar Gas
 
* Customers:
 
* Customers:
Line 50: Line 52:
 
* [http://killajoules.wikidot.com/archive:qatar-petroleum-and-partners-celebrate-adriatic-lng Qatar Petroleum and partners celebrate Adriatic LNG terminal 10th anniversary in Italy
 
* [http://killajoules.wikidot.com/archive:qatar-petroleum-and-partners-celebrate-adriatic-lng Qatar Petroleum and partners celebrate Adriatic LNG terminal 10th anniversary in Italy
 
abarrelfullabarrelfull wrote on 1 Feb, 08:51]
 
abarrelfullabarrelfull wrote on 1 Feb, 08:51]
 +
 +
[[category:LNG]]
 +
[[category:Italy]]
 +
[[category:Exxon]]

Latest revision as of 16:05, 21 February 2023

Summary Information

  • Ownership: Terminale GNL Adriatico Srl, commonly known as Adriatic LNG
  • Qatar Terminal Limited (45%) - a Qatar Petroleum subsidiary
  • ExxonMobil Italiana Gas (45%) – an ExxonMobil subsidiary
  • Edison (10%).
  • Website: http://www.adriaticlng.com/
  • Location: Porto Viro
  • Capacity: million tons/annum , 8 billion cubic meters of natural gas a year
  • Status: In Operation

Technical Details

  • Storage capacity: Two LNG storage tanks, each with a capacity of 125,000 cubic meters
  • Unloading capacity:
  • Send out capacity: 775 million cubic feet of natural gas per day

Constructors

  • Dragados Offshore:
    • Modular fabrication of the regasification terminal and all auxiliary structures
    • Integration of both the storage tanks and all modules on the GBS
  • The concrete LNG storage caisson was built by ACCIONA Infrastructure
  • Aker Kvaerner and Skanska's Norwegian subsidiary provided engineering and project management services
  • Emtunga: Living Quarters and Maintenance Building
  • Freyssinet: LNG Tank post-tensioning


Ongoing Projects/Project Status

  • In operation since 2009

Suppliers / Customers

  • Suppliers: Qatar Gas
  • Customers:
    • 80% of the terminal’s regasification capacity (equal to 6.4 billion cubic meters a year) will be reserved for Edison.

The remaining 20% will be available to market operators

History

  • 2004 - Aker Kvaerner awarded front-end engineering design (FEED) contract
  • 2004 - Aker Kvaerner awarded detailed design and planning contract
  • 2005 - Exxon & QP acquired majority of the project
  • 2008 - LNG storage caisson leaves Algeciras Bay for the Adriatic Sea
  • 2009 - Terminal operations started

Other Information

  • The Adriatic LNG Terminal is the first ever offshore Gravity Based Structure (GBS) for unloading, storing and regasifying Liquefied Natural Gas (LNG).
  • The facility is located offshore of Porto Levante, in the northern Adriatic Sea, about 15 kilometers off the Veneto coastline, where it is set on the sea floor.