Difference between revisions of "Acajutla LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === === Technical Details === * Storage...") |
Abarrelfull (talk | contribs) |
||
(12 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Summary Information === | === Summary Information === | ||
− | * Ownership: | + | * Ownership: Energía del Pacífico (EDP) |
− | * Website: | + | * Website: https://www.energiadelpacifico.com/ |
* Location: | * Location: | ||
− | * Capacity: million tons/annum | + | * Capacity: 0.5 million tons/annum |
− | * Status: | + | * Status: In operation |
+ | |||
=== Brief Description === | === Brief Description === | ||
− | + | * The terminal utilises BW Tatiana as a Floating Storage and Regasification Unit (FSRU), with a capacity of 280 MMSCFD and storage capacity of 137,000 m3 | |
=== Technical Details === | === Technical Details === | ||
− | * Storage capacity: | + | * Storage capacity: 137,000 M3 |
* Unloading capacity: | * Unloading capacity: | ||
* Send out capacity: | * Send out capacity: | ||
* Constructor: | * Constructor: | ||
+ | ** Keppel Shipyard: Conversion of the vessel to an FSRU | ||
+ | ** Tractebel Engineering: Feasibility study | ||
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === | ||
− | + | * The terminal was commissioned in [[LNG Terminal Projects Completed in 2021 | 2021]] | |
=== Suppliers / Customers === | === Suppliers / Customers === | ||
* Suppliers: | * Suppliers: | ||
− | * Customers: | + | * Customers: a 378MW combined–cycle generation plant |
=== History === | === History === | ||
− | * | + | * 2020 - Keppel awarded the vessel conversion |
+ | * 2021 - Terminal begins operations | ||
=== Other Information === | === Other Information === | ||
Line 32: | Line 36: | ||
- | - | ||
=== Links === | === Links === | ||
− | # | + | # [[Tractebel Engineering LNG References]] |
+ | # [https://abarrelfull.blogspot.com/2022/01/keppel-o-secures-two-contracts-worth.html Keppel O&M secures two contracts worth approximately $200 million] | ||
+ | # [https://abarrelfull.blogspot.com/2022/01/bw-tatiana-in-el-salvador.html BW Tatiana in El Salvador] | ||
[[category:LNG]] | [[category:LNG]] | ||
[[category:El Salvador]] | [[category:El Salvador]] |
Latest revision as of 14:13, 21 January 2022
Contents
Summary Information
- Ownership: Energía del Pacífico (EDP)
- Website: https://www.energiadelpacifico.com/
- Location:
- Capacity: 0.5 million tons/annum
- Status: In operation
Brief Description
- The terminal utilises BW Tatiana as a Floating Storage and Regasification Unit (FSRU), with a capacity of 280 MMSCFD and storage capacity of 137,000 m3
Technical Details
- Storage capacity: 137,000 M3
- Unloading capacity:
- Send out capacity:
- Constructor:
- Keppel Shipyard: Conversion of the vessel to an FSRU
- Tractebel Engineering: Feasibility study
Ongoing Projects/Project Status
- The terminal was commissioned in 2021
Suppliers / Customers
- Suppliers:
- Customers: a 378MW combined–cycle generation plant
History
- 2020 - Keppel awarded the vessel conversion
- 2021 - Terminal begins operations
Other Information
-