Difference between revisions of "Acajutla LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 35: Line 35:
 
=== Links ===
 
=== Links ===
 
# [[Tractebel Engineering LNG References]]
 
# [[Tractebel Engineering LNG References]]
 +
# [https://abarrelfull.blogspot.com/2022/01/keppel-o-secures-two-contracts-worth.html  Keppel O&M secures two contracts worth approximately $200 million]
 
# [https://abarrelfull.blogspot.com/2022/01/bw-tatiana-in-el-salvador.html BW Tatiana in El Salvador]
 
# [https://abarrelfull.blogspot.com/2022/01/bw-tatiana-in-el-salvador.html BW Tatiana in El Salvador]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:El Salvador]]
 
[[category:El Salvador]]

Revision as of 14:13, 21 January 2022

Summary Information

Brief Description

  • The terminal utilises BW Tatiana as a Floating Storage and Regasification Unit (FSRU), with a capacity of 280 MMSCFD and storage capacity of 137,000 m3

Technical Details

  • Storage capacity: 137,000 M3
  • Unloading capacity:
  • Send out capacity:
  • Constructor:
    • Tractebel Engineering: Feasibility study

Ongoing Projects/Project Status

  • The terminal was commissioned in 2021

Suppliers / Customers

  • Suppliers:
  • Customers: a 378MW combined–cycle generation plant

History

  • 2021 - Terminal begins operations

Other Information

-

Links

  1. Tractebel Engineering LNG References
  2. Keppel O&M secures two contracts worth approximately $200 million
  3. BW Tatiana in El Salvador