Difference between revisions of "Acajutla LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 2: | Line 2: | ||
* Ownership: Energía del Pacífico (EDP) | * Ownership: Energía del Pacífico (EDP) | ||
− | * Website: | + | * Website: https://www.energiadelpacifico.com/ |
* Location: | * Location: | ||
* Capacity: 0.5 million tons/annum | * Capacity: 0.5 million tons/annum |
Revision as of 14:11, 21 January 2022
Contents
Summary Information
- Ownership: Energía del Pacífico (EDP)
- Website: https://www.energiadelpacifico.com/
- Location:
- Capacity: 0.5 million tons/annum
- Status: In operation
Brief Description
- The terminal utilises BW Tatiana as a Floating Storage and Regasification Unit (FSRU), with a capacity of 280 MMSCFD and storage capacity of 137,000 m3
Technical Details
- Storage capacity: 137,000 M3
- Unloading capacity:
- Send out capacity:
- Constructor:
- Tractebel Engineering: Feasibility study
Ongoing Projects/Project Status
- The terminal was commissioned in 2021
Suppliers / Customers
- Suppliers:
- Customers: a 378MW combined–cycle generation plant
History
- 2021 - Terminal begins operations
Other Information
-