Difference between revisions of "Acajutla LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
=== History === | === History === | ||
− | * | + | * 2021 - Terminal begins operations |
=== Other Information === | === Other Information === |
Revision as of 13:59, 21 January 2022
Contents
Summary Information
- Ownership: Energía del Pacífico (EDP)
- Website:
- Location:
- Capacity: 0.5 million tons/annum
- Status: In operation
Brief Description
- The terminal utilises BW Tatiana as a Floating Storage and Regasification Unit (FSRU), with a capacity of 280 MMSCFD and storage capacity of 137,000 m3
Technical Details
- Storage capacity: 137,000 M3
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
- The terminal was commissioned in 2021
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2021 - Terminal begins operations
Other Information
-