Difference between revisions of "Acajutla LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 18: Line 18:
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
 
+
* The terminal was commissioned in [[LNG Terminal Projects Completed in 2021 | 2021]]
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===

Revision as of 13:55, 21 January 2022

Summary Information

  • Ownership: Energía del Pacífico (EDP)
  • Website:
  • Location:
  • Capacity: 0.5 million tons/annum
  • Status: In operation

Brief Description

  • The terminal utilises BW Tatiana as a Floating Storage and Regasification Unit (FSRU), with a capacity of 280 MMSCFD and storage capacity of 137,000 m3

Technical Details

  • Storage capacity: 137,000 M3
  • Unloading capacity:
  • Send out capacity:
  • Constructor:

Ongoing Projects/Project Status

  • The terminal was commissioned in 2021

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 200X -

Other Information

-

Links

  1. BW Tatiana in El Salvador