Abadi LNG Terminal

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Ownership:
    • INPEX Masela (Operator) : 65%
    • Pertamina 20% *
    • Petronas - 15%
  • Website: http://www.inpex.co.jp/english/index.html
  • Location: Masela block, Indonesia
  • Capacity: 9.5 million tons/annum
  • Status: Planned

Brief Description

  • The Abadi LNG Project is based on an onshore LNG development scheme that INPEX as the operator is preparing for development in the Masela Block offshore Indonesia. The project is expected to produce approximately 9.5 million tons of LNG per year and up to approximately 35,000 barrels of condensate per day.
  • The project will also supply 150 million cubic feet of natural gas per day via pipeline to address local demand for natural gas.
  • Planned production is for 2030
  • Technical details have not been decided.

Technical Details

  • Storage capacity:
  • Constructor:
    • **Wood Group:** Detailed engineering works for SURF, which mainly consists of Subsea production system, Umbilicals, Risers and Flow lines
    • JGC Corporation / PT JGC Indonesia: FLNG FEED
    • Saipem: FLNG FEED
  • Licensor:


Ongoing Projects/Project Status

  • Still at the planning stage
  • INPEX Masela is currently preparing to award Front-End Engineering and Design (FEED) contracts, which is scheduled for the 1st half of 2012

Suppliers / Customers

  • Suppliers: The gas will come from Inpex's Abadi Gas Field in the Masela block of the Timor Sea
  • Customers: Inpex will supply the gas to its customers in Japan

History

  • 1998 - INPEX acquired a 100% working interest in the Masela block in November through an open bidding process
  • 2008 - PreFEED completed
  • 2009 - PT EMP Energi Indonesia (EMPI) acquired a 10% stake in the project
  • 2010 - Government Approval of the Development Plan of the Abadi Gas Field
  • 2011 - Shell becomes a partner in the project
  • 2012 - INPEX launches subsea FEED
  • 2013 - INPEX launches FLNG FEED
  • 2014 - INPEX Granted Environmental Permit
  • 2023 - Shell sold its stake to Pertamina and Petronas

Other Information

  • -

Links

  1. Inpex in Indonesia
  2. Financial Results for the six months ended September 30, 2008
  3. Transfer of Interest in the Masela Block, the Arafura Sea, Indonesia
  4. Government Approval of the Development Plan of the Abadi Gas Field
  5. Two LNG Projects ‐ Ichthys and Abadi
  6. Partnering in the Abadi Project, the Masela Block, Arafura Sea, Indonesia
  7. INPEX launches subsea FEED for the Abadi LNG Project, the Masela Block, Indonesia
  8. INPEX launches FLNG FEED for the Abadi LNG Project, the Masela Block, Indonesia
  9. INPEX Granted Environmental Permit for Abadi LNG Project from Indonesian Government
  10. Shell completes sale of interest in Indonesia’s Masela block