AURA Oil And Gas Processing References

From A Barrel Full
Jump to navigation Jump to search
  1. Liwan 3-1 Gas Field
    • China
    • CNOOC
    • 4x12000kW - WHRU
  2. Halfaya Oil Field
    • IRAQ
    • CPE - IRAQ
    • 3x8000kW - Fired boiler - Phase I
  3. Madura BD Offshore Gas and Condensate Field
    • Indonesia
    • CNOOC Indonesia
    • 4x12000kW (3x41 MBtu/h) (Gas fired)
    • 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired)
    • QHD326 FPSO
  4. Shanghai Petro-chemical, Polyester Production
    • 12000kW (41 MBtu/h) (Heavy Oil fired)
  5. Beijing Yanshan Company Refinery
    • China
    • SINOPEC Yanshan Petro-chemical
    • 2x3000kW (2x10 MBtu/h) (Diesel Oil, Gas fired)
  6. CNPC (International) Sudan Fula Oil Field
    • 2x6100kW (2x21 MBtu/h) (Gas fired)
  7. Luda 27-2 And LD 32-2 Oil Fields
    • China
    • CNOOC
    • 3x5000kW (3x17 MBtu/h) (WHRU)
  8. Block 3 and 7 Oil Fields
    • South Sudan
    • PDOC
    • 2x4x13200kW (2x4x45 MBtu/h) (Diesel oil & Crude oil fired)
  9. Kela-2 Gas Field
    • China
    • CNPC
    • 2x6700kW (2x23 MBtu/h) (Gas fired)
  10. Qinhuangdao Offshore Oil Field
    • Nanbao Offshore Oil Field
    • China
    • CNOOC
    • 3x5000kW (3x17 MBtu/h) (Gas,diesel oil & crude oil fired)
  11. Bozhong 28-2S Oil Fields
    • China
    • CNOOC
    • 3x6000kW (3x20 MBtu/h) (WHRU)