Netra Nogat Pipeline System
Jump to navigation
Jump to search
Summary Information
- Source: Offshore Netherlands
- Destination: Den Helder
- Ownership: 45% Energie Beheer Nederland B.V. (EBN), 48.2% GDF Suez, and 1.8% by Venture Production.
- Website: http://www.nogat.nl/
- Length: 264 kilometres ( miles)
- Capacity: 12 billion cubic meters per annum
- Status: Operating
+++ Details
- A natural gas pipeline system, which connects Dutch continental shelf with an onshore gas plant and terminal at Den Helder, the Netherlands.
- It also transports gas from the Danish section of the North Sea, via the Tyra Oil and Gas Field
+++ Contractors
- **McDermott-ETPM:** Pipeline installation
++++ Related Fields
- A12a Gas Fields
- F3-FA Gas Field
- F3-FB Oil and Gas Field
- F15a Gas Fields
- L05a Gas Fields
- L8 And L5 Offshore Gas Fields
- L09a and L09b Gas Fields
- M07 Gas Fields
+++ History
- 1992 - Pipeline commissioned
- 2008 - GDF acquires a 30% share in the pipeline from NAM
- 2009 - Venture Production acquires a minor share from Lundin
- 2011 - GDF Suez Becomes Majority Shareholder In NOGAT
+++ Links