Daytona NGL Pipeline

From A Barrel Full
Revision as of 14:31, 10 May 2024 by Abarrelfull (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source: Permian Basi
  • Destination: North Texas
  • Ownership: Targa Resources
  • Website: https://www.targaresources.com/
  • Length: 400 kilometres ( miles)
  • Capacity: barrels of oil per day
  • Crude Type:

Brief Description

  • The Daytona NGL Pipeline will transport NGLs from the Permian Basin and connect to the 30-inch diameter segment of the Grand Prix NGL Pipeline in North Texas, from where volumes will be transported to fractionation and storage facilities in Mont Belvieu.

Pipeline Status

  • Under construction

History

  • 2024 - Daytona Pipeline is commissioned

Other Information

  • -

Links

  1. EIA Liquids Pipeline Projects 2021-2025