Summary Information
- Operator: Western Gas
- Country: Australia
- Location: northwest coast of Australi
- Production start: Expected 2024
- Partners:
- Type: Gas and Condensate
- Estimated Reserves:
- Production Volume:
+++ Description
- The permits cover over 1 million acres and are located approximately 115 miles off the northwest coast of Australia in water depths of approximately 3,600 feet
- The Equus Gas Project Basis of Design comprises an offshore processing facility and a pipeline to shore, with landfall near Onslow.
- Development will be phased, with the initial development comprising three production wells linked by subsea infrastructure to a Floating Production Storage and Offloading (FPSO) unit. Facilities on-board the FPSO will include gas dehydration, condensate stripping and gas compression. Water depth at the well locations is 1000m to 1200m.
- Dry sales gas will be piped to shore by way of a 220km pipeline, with onshore facilities dependent on the outcome of gas marketing arrangements. Gas supply is expected to be up to 250 terajoules of gas a day.
- Gas is to be supplied to North West Shelf LNG
+++ Contractors
- **Aker Solutions:** Conceptual Study
- **Wood Group Kenny:** Subsea and pipelines FEED contract
- **INTECSEA / WorleyParsons:** Topsides and floating system FEED engineering
+++ History
- 2012 - Subsea and platform FEED awarded
- 2014 - LOI signed for liquefaction contract with NWS
- 2017 - Wesetern Gas acquired the project from Hess
+++ Geology
+++ Links