Chandeleur Gas Pipeline
Revision as of 09:43, 16 September 2023 by Abarrelfull (talk | contribs)
Summary Information
- Source: Offshore Louisiana and Mississippi
- Destination: Pascagoula
- Ownership: Enlink Midstream
- Website: http://www.enlink.com/
- Length: kilometres (215 miles)
- Capacity: 330,000 MMcf/d
- Status: Operating
+++ Details
- 215 miles of offshore Mississippi and Alabama pipelines with a total capacity of approximately 330,000 MMcf/d
- It extends from the outer continental shelf, offshore Louisiana and Mississippi, to an onshore terminus near Pascagoula, Mississippi.
- Chandeleur’s system receives gas production from the Main Pass, Chandeleur Sound, Mobile, and Viosca Knoll areas and transports the gas to the [[[Pascagoula Gas Processing Plant]]], its only end-use customer
- It has connections with – Destin Gas Pipeline, Texas Eastern Transmission Gas Pipeline, LP, and Gulf South Gas Pipeline System
+++ History
- 2014 - Enlink Midstream acquires share from Chevron
+++ Other Information
- -
+++ Links