Pao de Acucar - Seat and Gavea Oil and Gas Fields

From A Barrel Full
Revision as of 15:38, 10 May 2023 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Operator: Equinor
  • Country: Brazil
  • Location: BM-C-33 block of the Campos Basin
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The fields will utilise an FPSO which will have topsides designed to produce approximately 125,000 barrels of crude oil per day as well as produce and export approximately 565 million standard cubic feet of associated gas per day. Its minimum storage capacity of crude oil will be 2,000,000 barrels.

Contractors

  • Modec: FEED and EPCI for FPSO

History

  • 2023 - Final investment decision

Geology

Links

  1. MODEC Awarded Contract by Equinor to Supply the 2nd FPSO in Brazil