G14, G16 and G17 Gas Fields
Summary Information
- Operator: GDF Suez
- Country: Netherlands
- Location:
- Production start: 2002
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- Initially production was from G17-d-A Platform
- The second phase of development consisted of the relocation of two existing platforms and one sub-sea completion, the construction of two new platforms and the laying of 46-km offshore gas pipeline.
- The platforms are; a central production platform, G17d-AP, three satellite platforms, G14-A, G16-A and K2b-A and a subsea completion, G17a-S1
- Gas is transported on the Noordgastransport NGT Gas Pipeline
+++ Contractors
- **Saipem:** Transport and installation of G17-d-A
- **HSM:** G17d-AP Topsides
- **Seaway Heavy Lifting:** Transport & installation of the K2b-A Production Platform
+++ History
- 2002 - First gas from G17-d
- 2005 - G17-d-AP Production Platform installed
- 2006 - Production started
+++ Geology