Chennai LNG Terminal
Contents
Summary Information
- Ownership: IndianOil
- Website: http://www.iocl.com/
- Location: Ennore, India
- Capacity: 5.0 million tons/annum
- Status: In operation
Brief Description
- A small regasification unit, the terminal will initially have the capacity to handle five million metric tonnes per annum (MMTPA), expanding to 15 MMTPA in the future
Technical Details
- Storage capacity: 2 * 180,000m^^3^^ tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
- Tractebel: Consultancy services for the preparation of a detailed feasibility report
- MHI: Construction of LNG storage tanks
- Foster Wheeler: front-end engineering and design (FEED)
Ongoing Projects/Project Status
- The terminal was completed in 2019
Suppliers / Customers
- Suppliers:
- Customers: A 1000 MW LNG based Power plant on the same site will be the anchor customer
History
- 2010 - IndianOil signs MoU with TIDCO
- 2012 - Foster Wheeler Awarded Contract for basic design, front-end engineering design, and the preparation of capital and operating cost estimates
- 2015 - MHI awarded tank construction contract
- 2019 - Terminal operations started