Difference between revisions of "Rio Bravo Gas Pipeline"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "=== Summary Information === * Source: * Destination: * Ownership: * Website: * Length: kilometres ( miles) * Capacity: per day * Status: (Operating/Planned/Under Cons...")
 
Line 10: Line 10:
  
 
=== Details ===
 
=== Details ===
* -
+
* The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's [[Rio Grande Export Terminal LNG Project]] in Brownsville, Texas
  
 
=== History ===
 
=== History ===
* -  
+
* 2024 - Enbridge became a partner in the pipeline
  
 
=== Other Information ===
 
=== Other Information ===
Line 19: Line 19:
  
 
=== Links ===
 
=== Links ===
# []
+
# [https://abarrelfull.blogspot.com/2024/05/enbridge-to-enter-into-jv-connecting.html Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand]
  
 
[[category:Pipeline]]
 
[[category:Pipeline]]
 
[[category:Country]]
 
[[category:Country]]
 
[[category:Company]]
 
[[category:Company]]

Revision as of 09:58, 13 May 2024

Summary Information

  • Source:
  • Destination:
  • Ownership:
  • Website:
  • Length: kilometres ( miles)
  • Capacity: per day
  • Status: (Operating/Planned/Under Construction)

Details

  • The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande Export Terminal LNG Project in Brownsville, Texas

History

  • 2024 - Enbridge became a partner in the pipeline

Other Information

  • -

Links

  1. Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand