Difference between revisions of "Satah Al-Razboot SARB Oil Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: ADMA-OPCO | * Operator: ADMA-OPCO | ||
* Country: UAE | * Country: UAE | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day | * The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day | ||
− | * Drilling | + | * Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export. |
− | + | === Contractors === | |
− | * | + | * '''Fluor:''' Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure. |
− | * | + | * '''Petrofac:''' |
** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables. | ** 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables. | ||
** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island. | ** The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island. | ||
** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules. | ** The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules. | ||
− | * | + | * '''JDR:''' design and manufacture of five subsea power and communication (composite) cables and associated accessories |
− | + | === History === | |
* 2010 - Fluor Wins FEED Contract for full field development | * 2010 - Fluor Wins FEED Contract for full field development | ||
* 2013 - Petrofac awarded major subsea project | * 2013 - Petrofac awarded major subsea project | ||
* 2021 - Cepsa sold its stake to TotalEnergies | * 2021 - Cepsa sold its stake to TotalEnergies | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Bluewater Calm Buoy Mooring References]] | # [[Bluewater Calm Buoy Mooring References]] | ||
# [http://killajoules.wikidot.com/archive:fluor-wins-offshore-feed-contract-in-abu-dhabi Fluor Wins Offshore FEED Contract in Abu Dhabi] | # [http://killajoules.wikidot.com/archive:fluor-wins-offshore-feed-contract-in-abu-dhabi Fluor Wins Offshore FEED Contract in Abu Dhabi] |
Revision as of 13:26, 26 March 2024
Summary Information
- Operator: ADMA-OPCO
- Country: UAE
- Location: 120 kilometres to the northwest of Abu Dhabi
- Production start: 2016 - Expected
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The Satah Al-Razboot (SARB) Full Field Development Project includes an untapped oil field that will prospectively pump 100,000 barrels per day
- Drilling is conducted from two artificial islands (Al Qatia and Bu Sikeen) with the well fluid sent by subsea pipeline to a facility on Zirku Island for processing, storage and export.
Contractors
- Fluor: Design of offshore wellhead facilities, subsea and in-field pipelines, the onshore scope including receiving, processing, storage and support facilities, and the supporting utilities and infrastructure.
- Petrofac:
- 200km of subsea pipelines for well fluid, water injection, gas injection, flare and export, along with 3km of onshore pipeline and 55km of subsea power and communication cables.
- The provision of two riser platforms and four flare platforms with four interconnecting bridges and one single point mooring (SPM) buoy located at the north of Zirku Island.
- The onshore scope of the contract includes the following: drilling utilities, foundations on SARB1 and SARB2, transport, install, hook up and assistance in the commissioning of the accommodation modules.
- JDR: design and manufacture of five subsea power and communication (composite) cables and associated accessories
History
- 2010 - Fluor Wins FEED Contract for full field development
- 2013 - Petrofac awarded major subsea project
- 2021 - Cepsa sold its stake to TotalEnergies
Geology
Links
- Bluewater Calm Buoy Mooring References
- Fluor Wins Offshore FEED Contract in Abu Dhabi
- Petrofac Awarded US$500 Million Offshore Project in Abu Dhabi
- Petrofac Awards JDR Contract For Subsea Power Cables At Abu Dhabi’s Satah Al-Razboot (Sarb) Offshore Oil Field Development
- Cepsa accelerates its Positive Motion strategy implementation with the sale of its upstream assets in Abu Dhabi to TotalEnergies