Difference between revisions of "Cluster 2 Oil and Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
 
Line 11: Line 11:
 
=== Description ===
 
=== Description ===
 
* Located in the KG-DWN-98/2 Deep Water Block at a water depth of between 984 feet (300 meters) and 10,500 feet (3,200 meters)
 
* Located in the KG-DWN-98/2 Deep Water Block at a water depth of between 984 feet (300 meters) and 10,500 feet (3,200 meters)
* The development includes a Central processing Platform, the [[Armada Sterling V FPSO]] and 34 deepwater trees
+
* The development includes a Central processing Platform with a bridge connected Living Quarters platform for processing gas from Free gas wells, the [[Armada Sterling V FPSO]] for Processing, Storage and evacuation of Oil/ Gas.
* Gas is processed at an onshore plant
+
** There are about 430 Kms Sub-sea Pipelines of various sizes from 6” to 22”, about 151 Kms umbilical and 10 Manifolds, Riser base Manifolds and Onshore gas handling terminal.
 +
** In total there will be 35 wells, 15 Oil Producers, 12 Water Injection and 8 Free Gas Producers
 +
 
  
 
=== Contractors ===
 
=== Contractors ===
Line 23: Line 25:
  
 
=== History ===
 
=== History ===
 +
* 2016 - Board approves the development
 
* 2018 - Contracts awarded for the development
 
* 2018 - Contracts awarded for the development
 
* 2022 - The U field came onstream
 
* 2022 - The U field came onstream
Line 32: Line 35:
  
 
=== Links ===
 
=== Links ===
 +
# [https://abarrelfull.blogspot.com/2024/02/ongc-board-approves-field-development.html ONGC Board approves Field Development Plan (FDP) for development of Cluster 2 fields of Deep-water NELP Block KG-DWN-98/2]
 
# [https://a-barrel-full.blogspot.com/2023/11/mcdermott-awarded-transportation-and.html McDermott Awarded Transportation and Installation Contract by ONGC]
 
# [https://a-barrel-full.blogspot.com/2023/11/mcdermott-awarded-transportation-and.html McDermott Awarded Transportation and Installation Contract by ONGC]
 
# [https://abarrelfull.blogspot.com/2023/11/honble-prime-minister-dedicates-ongc-u.html Hon’ble Prime Minister dedicates ONGC U-field Onshore facilities of KG-DWN-98/2 Deep Water Block to the Nation]
 
# [https://abarrelfull.blogspot.com/2023/11/honble-prime-minister-dedicates-ongc-u.html Hon’ble Prime Minister dedicates ONGC U-field Onshore facilities of KG-DWN-98/2 Deep Water Block to the Nation]

Latest revision as of 10:38, 7 February 2024

Summary Information

  • Operator: ONGC
  • Country: India
  • Location: Krishna Godavari basin
  • Production start: 2024
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • Located in the KG-DWN-98/2 Deep Water Block at a water depth of between 984 feet (300 meters) and 10,500 feet (3,200 meters)
  • The development includes a Central processing Platform with a bridge connected Living Quarters platform for processing gas from Free gas wells, the Armada Sterling V FPSO for Processing, Storage and evacuation of Oil/ Gas.
    • There are about 430 Kms Sub-sea Pipelines of various sizes from 6” to 22”, about 151 Kms umbilical and 10 Manifolds, Riser base Manifolds and Onshore gas handling terminal.
    • In total there will be 35 wells, 15 Oil Producers, 12 Water Injection and 8 Free Gas Producers


Contractors

  • Baker Hughes:
    • Subsea hardware including trees, manifolds, controls, connection systems, SPS installation tools and services, as well as flexible risers and flowlines, umbilical and topside controls
  • McDermott:
    • Transportation and installation of a central processing platform (CPP) and living quarters
    • Transportation and installation of SURF and SPS facilities

Sembcorp Marine: Hull repairs and upgrading as well as fabrication of topside modules for the FPSO

History

  • 2016 - Board approves the development
  • 2018 - Contracts awarded for the development
  • 2022 - The U field came onstream
  • 2023 - Installation contract awarded
  • 2024 - First oil produced

Geology

Links

  1. ONGC Board approves Field Development Plan (FDP) for development of Cluster 2 fields of Deep-water NELP Block KG-DWN-98/2
  2. McDermott Awarded Transportation and Installation Contract by ONGC
  3. Hon’ble Prime Minister dedicates ONGC U-field Onshore facilities of KG-DWN-98/2 Deep Water Block to the Nation
  4. BHGE, McDermott, L&T Hydrocarbon Engineering Win Largest Indian Subsea Project for ONGC’s Prestigious 98/2 Block
  5. ONGC announces “First Oil” from the deep-water KG-DWN-98/2 Block